✓ MahaRERA P99000024120RERA: no litigation reportedBhakti Apartment Phase II
Saryu Builders & Developers
📍 Nearby Genesis Industrial Estate, Palghar · 401501
24
Units
2022
Possession
1
Buildings
Kept in Abeyance
Status
Lifecycle requires verification
Ask an advisor to verify the current project and inventory status.
Source stage: New Project · mapped resale: 0 · mapped rental: 0 · primary status: not confirmed
01
Possession Timeline
Proposed
Sep 2022
Status
New Project
02
Unit Configurations (per MahaRERA)
ConfigurationCarpetIndicative Price
Shop94–164 ft²On request
1 BHK334–358 ft²On request
Configurations & carpet per MahaRERA filing · indicative price = locality rate × carpet (not the developer's quote).
💬 Verify current inventory with an advisor03
RERA Trust Record
MahaRERA No.
P99000024120
Registered
—
Litigation
No reported in source
Escrow Bank
AXIS BANK
Architect
—
Total FSI
634
04
Buildings · 1 Wing(s)
Building No 1 Wing B Type B1b— floors · — units
05
Land DNA · Genesis
Redevelopment / SRA / MHADA / MMRDA / Freehold — provenance from MPE's verification layer. The genesis no portal shows.
06
Location
📍 Nearby Genesis Industrial Estate
▸ Explore map & Street View — for verified buyers
09
Construction Progress
0% avgExcavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%
10
Amenities
Aggregate area of recreational Open SpaceElectrical Meter Room, Sub-Station, Receiving StationLandscaping & Tree PlantingSewerage (Chamber, Lines, Septic Tank , STP)Water Conservation, Rain water HarvestingWater Supply
12
Talk to our MahaRERA advisor
Tell our MahaRERA advisor what you need and they'll guide you on this project.
💬 Verify current project inventory?
Frequently Asked Questions
When is possession of Bhakti Apartment Phase II?
As per MahaRERA, proposed possession is Sep 2022.
Is Bhakti Apartment Phase II RERA-registered?
Yes — MahaRERA registration P99000024120. The current MahaRERA source record reports no litigations.
Who is the developer?
Saryu Builders & Developers
How do I book or get more details?
Tap WhatsApp or Call below to speak with a Mumbai Property Exchange advisor — serving Mumbai since 1995 · RERA-registered since 2017.