Harbour Heights

by Radius Sumer Developers Private Limited
Kept in AbeyanceP51900004243
šŸ’¬ WhatsAppšŸ“ž Call

Project Information

RERA Certificate No.
P51900004243
Registration No.
REA51900017920
Developer
Radius Sumer Developers Private Limited
Architect
Girish Chaudhari
Project Bank
Standard Chartered Bank
Proposed Possession
2009-12-31
Revised Possession
2026-12-30
Extended Possession
1900-01-01
Buildings
6
Project Area
38881.58 sq.m
Total FSI
267090.48
Approved FSI
201566.81
Litigations
āš ļø Yes
MahaRERA QR
Harbour Heights
MahaRERA — P51900004243
Scan to verify on MahaRERA portal

Wing-wise Details

ā¬‡ļøBasements4
šŸ…æļøClosed Parking501
šŸ“…Completion1900-01-01
ā¬‡ļøBasements4
šŸ…æļøClosed Parking180
šŸ“…Completion1900-01-01
ā¬‡ļøBasements4
šŸ…æļøClosed Parking633
šŸ“…Completion2025-12-31
ā¬‡ļøBasements4
šŸ…æļøClosed Parking609
šŸ“…Completion2025-12-31
ā¬‡ļøBasements4
šŸ…æļøClosed Parking608
šŸ“…Completion2025-12-31
ā¬‡ļøBasements4
šŸ…æļøClosed Parking633
šŸ“…Completion2025-12-31

Apartment Configurations

Retail 1

TypeCarpet (sq.ft)TotalBookedAvailableStatus
Food Court610.63101
0%
GYM133.91101
0%
Godown 12189.0101
0%
Godown 22451.0101
0%
MP HALL 01234.98101
0%
MP HALL 02207.23101
0%
Type A5.93404
0%
Type B6.32909
0%
Type C6.421100110
0%
Type D6.7216016
0%
Type E6.338190819
0%
Type F7.3913013
0%
Type G7.728028
0%
Type H7.8755055
0%
Type I8.01700170
0%
Type J8.383460346
0%
Type K8.7513013
0%
Type L9.3313013
0%
Type M10.5185085
0%
Type N11.1321021
0%
Type O11.9812012
0%
Type P12.4678078
0%
Type Q13.5621021
0%
Type R14.0720020
0%
Type S14.515015
0%
Type T16.2404
0%
Type U16.4813013
0%
Type V18.12101
0%
Type W19.67606
0%
Type X23.3303
0%
Type Y205.24101
0%
Type Z349.38101
0%

Retail 2

TypeCarpet (sq.ft)TotalBookedAvailableStatus
BANQUET 0198.77101
0%
BANQUET 0268.78101
0%
BANQUET 0395.35101
0%
BANQUET 0477.76101
0%
FOOD COURT1242.15101
0%
OFFICE44.25101
0%
Type A5.28606
0%
Type B5.38303
0%
Type C5.5606
0%
Type D6.3511011
0%
Type E6.52303
0%
Type F6.6808
0%
Type G6.72303
0%
Type H6.821010101
0%
Type I6.832380238
0%
Type J7.1404
0%
Type K7.42505
0%
Type L7.7230030
0%
Type M8.3231031
0%
Type N8.92606
0%
Type O8.81404
0%
Type P9.5310010
0%
Type Q9.8317017
0%
Type R10.4312012
0%
Type S11.0212012
0%
Type T11.42101
0%
Type U11.63404
0%
Type V11.88303
0%
Type W12.2213013
0%
Type X12.49404
0%
Type Y13.9101
0%
Type Z20.01101
0%

Tower 2

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK A55.53707
0%
1 BHK B57.09707
0%
1 BHK C57.08909
0%
1 BHK D55.56909
0%
2 BHK A74.46202
0%
2 BHK B72.8928028
0%
2 BHK C74.0532032
0%
2 BHK D75.62808
0%
2 BHK E74.67808
0%
2 BHK F75.8622022
0%
2 BHK G76.1710010
0%
2.5 BHK A89.55202
0%
2.5 BHK B88.1328028
0%
2.5 BHK C89.0732032
0%
2.5 BHK D90.49808
0%
2.5 BHK E89.96808
0%
2.5 BHK F91.3822022
0%
2.5 BHK G91.6610010
0%
3 BHK A107.79707
0%
3 BHK B109.8221021
0%
3 BHK C111.8316016
0%
3 BHK D113.310010
0%
3 BHK DUP88.07505
0%
3 BHK Dup A194.66202
0%
3 BHK Dup B197.85303
0%
3 BHK Dup C202.12202
0%

Tower 3

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK A55.53927
22%
1 BHK B57.09990
100%
1 BHK C57.08725
29%
1 BHK D55.56734
43%
2 BHK A74.46202
0%
2 BHK B72.89281315
46%
2 BHK C74.05321121
34%
2 BHK D75.62853
62%
2 BHK E74.67844
50%
2 BHK F75.8622121
5%
2 BHK G76.1740040
0%
2.5 BHK A89.55202
0%
2.5 BHK B88.13281414
50%
2.5 BHK C89.07321220
38%
2.5 BHK D90.49862
75%
2.5 BHK E89.96826
25%
2.5 BHK F91.3822418
18%
2.5 BHK G91.6640040
0%
3 BHK A107.79770
100%
3 BHK B109.8221138
62%
3 BHK C111.8316313
19%
3 BHK D113.338038
0%
3 BHK Dup A194.66202
0%
3 BHK Dup B197.85303
0%
3 BHK Dup C202.12101
0%

Tower 4

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK C57.08707
0%
1 BHK D55.56707
0%
2 BHK A74.46404
0%
2 BHK B72.8926026
0%
2 BHK C74.0532329
9%
2 BHK D75.62817
12%
2 BHK E74.671055
50%
2 BHK F75.8620020
0%
2 BHK G76.1740040
0%
2.5 BHK A89.55404
0%
2.5 BHK B88.1326323
12%
2.5 BHK C89.0732275
84%
2.5 BHK D90.49835
38%
2.5 BHK E89.9610100
100%
2.5 BHK F91.3820614
30%
2.5 BHK G91.6640040
0%
3 BHK A107.7920020
0%
3 BHK B109.8238038
0%
3 BHK C111.8327324
11%
3 BHK D113.338038
0%

Construction Progress

Retail 1

Excavation92%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.2%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth14%
X number of Podiums0%
X number of Slabs of Super Structure0%

Retail 2

Excavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

Tower 1

Excavation85%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth4%
X number of Podiums0%
X number of Slabs of Super Structure0%

Tower 2

Excavation57%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

Tower 3

Excavation42%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

Tower 4

Excavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

RERA Registered Amenities

āœ…Aggregate area of recreational Open Space
⬜Community Buildings
āœ…Electrical Meter Room, Sub-Station, Receiving Station
⬜Energy management
āœ…Fire Protection And Fire Safety Requirements
āœ…GYM FITNESS CENTRE
āœ…JOGGING TRACK
āœ…KIDS OUTDOOR PLAY AREA
āœ…KIDS POOL
āœ…Landscaping & Tree Planting
āœ…MULTIPURPOSE HALL
⬜Open Parking
āœ…REFLEXOLOGY TRACK PEBBLE WALK
āœ…SENIOR CITIZEN AREA
āœ…SKATING RINK
āœ…SWIMMING POOL
āœ…Sewerage (Chamber, Lines, Septic Tank , STP)
āœ…Solid Waste Management And Disposal
āœ…Storm Water Drains
⬜Street Lighting
āœ…TODDLER INDOOR PLAY ROOM
āœ…Treatment And Disposal Of Sewage And Sullage Water
āœ…Water Conservation, Rain water Harvesting
āœ…Water Supply
CallWhatsApp
āœ‰ļø

Get in Touch

Our team will connect with you shortly

+91
šŸ”’ Your details are secure with us
⚔ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.
šŸ‘‹ Looking for the right project? Let me help you find it!
šŸ—ļø
MPE Project Advisor
ā— Online now