Kurla Kadam Scoiety Phase 1

by Pramod Pisal
Certificate SignedP51800006382
Kurla Kadam Scoiety Phase 1Project photos will appear here when available.

Project Information

RERA Certificate No.
P51800006382
Registration No.
REA51800015933
Developer
Pramod Pisal
Project Bank
ICICI Bank
Proposed Possession
2024-12-31
Revised Possession
2022-06-30
Extended Possession
2024-12-31
Units Sold
0
Buildings
4
Project Area
7548.70 sq.m
Total FSI
20945.69
MahaRERA QR
Kurla Kadam Scoiety Phase 1
MahaRERA — P51800006382
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors17
✅Sanctioned17
🏗️Proposed Floors13
✅Sanctioned13
🏗️Proposed Floors18
✅Sanctioned18
🏗️Proposed Floors8
✅Sanctioned8

Apartment Configurations

M M Residency

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK38.8356560
100%
1BHK40.0454540
100%
1BHK48.03404
0%
1BHK49.52202
0%
2BHK57.3256560
100%
2BHK74.79202
0%
3BHK90.12202
0%

Rehab Building 2

TypeCarpet (sq.ft)TotalBookedAvailableStatus
SLUMREHAB—000
0%

Rehab Building 3

TypeCarpet (sq.ft)TotalBookedAvailableStatus
SLUM REHAB—000
0%

Rehab Building No 1

TypeCarpet (sq.ft)TotalBookedAvailableStatus
REHAB—000
0%

Construction Progress

M M Residency

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises88%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises80%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

Rehab Building 2

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

Rehab Building 3

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

Rehab Building No 1

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

RERA Registered Amenities

✅Aggregate area of recreational Open Space
⬜Community Buildings
✅Electrical meter room, sub-station, receiving station100%
⬜Energy managemcnt
✅Fire protection and fire safety requirements
✅Internal Roads & Footpaths80%
✅Landscaping & Tree Planting
⬜Open Parking
✅Sewerage (Chamber, Lines, Septic Tank , STP)100%
⬜Solid Waste Management And Disposal
✅Storm Water Drains100%
⬜Street Lighting
⬜Treatment And Disposal Of Sewage And Sullage Water
✅Water Supply80%
⬜Water conservation /Rain water harvesting