📞 +91 98200 30685 ✉️
RERA: A51800043517

LODHA AMARA - TOWER 26, 27, 28, 30, 34, 35

by LODHA DEVELOPERS LIMITED Company
Certificate Signed P51700001031
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700001031
Registration No.
REA51700005323
Registration Date
2021-09-09
Developer
LODHA DEVELOPERS LIMITED Company
Project Bank
UNION BANK OF INDIA
Proposed Possession
2021-12-30
Revised Possession
2021-12-30
Extended Possession
1900-01-01
Units Sold
0
Buildings
6
Project Area
8798.25 sq.m
Total FSI
62653.52
Approved FSI
62653.52
MahaRERA QR
LODHA AMARA - TOWER 26, 27, 28, 30, 34, 35
MahaRERA — P51700001031
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors30
Sanctioned30
🅿️Closed Parking173
📅Completion2020-12-31
🏗️Proposed Floors30
Sanctioned30
🅿️Closed Parking170
📅Completion2020-12-31
🏗️Proposed Floors30
Sanctioned30
🅿️Closed Parking172
📅Completion2020-12-31
🏗️Proposed Floors30
Sanctioned30
🅿️Closed Parking171
📅Completion2020-12-31
🏗️Proposed Floors30
Sanctioned30
🅿️Closed Parking173
📅Completion2020-12-31
🏗️Proposed Floors30
Sanctioned30
🅿️Closed Parking172
📅Completion2020-12-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1 Bhk C 34.02000045776367 0 0 0
0%
1 Bhk D 46.5 0 0 0
0%
1Bhk 34.02000045776367 0 0 0
0%
1Bhk 38.470001220703125 0 0 0
0%
1Bhk 40.5 0 0 0
0%
1Bhk 42.470001220703125 0 0 0
0%
1Bhk 43.86000061035156 0 0 0
0%
2 Bhk Optima 50.720001220703125 0 0 0
0%
2 Bhk Ultima 56.630001068115234 0 0 0
0%
2 Bhk Ultima 57.79999923706055 0 0 0
0%
2 Bhk Ultima 62.400001525878906 0 0 0
0%
2 Bhk Ultima 62.45000076293945 0 0 0
0%
2Bhk 48.79999923706055 0 0 0
0%
2Bhk 50.70000076293945 0 0 0
0%
2Bhk 56.59000015258789 0 0 0
0%
2Bhk 56.630001068115234 0 0 0
0%
2Bhk 62.45000076293945 0 0 0
0%
2Bhk Optima 48.79999923706055 0 0 0
0%
2Bhk Optima 48.83000183105469 0 0 0
0%
2Bhk Optima 50.70000076293945 0 0 0
0%
2Bhk Optima 50.720001220703125 0 0 0
0%
2Bhk Uitima 57.83000183105469 0 0 0
0%
2Bhk Ultima 56.59000015258789 0 0 0
0%
2Bhk Ultima 57.599998474121094 0 0 0
0%
2Bhk Ultima 57.650001525878906 0 0 0
0%
2Bhk Ultima 57.79999923706055 0 0 0
0%
2Bhk Ultima 57.83000183105469 0 0 0
0%
2Bhk Ultima 62.400001525878906 0 0 0
0%
2Bhk Ultima 62.45000076293945 0 0 0
0%
2Bhksmall 40.95000076293945 0 0 0
0%
2Bhksmall 41.0 0 0 0
0%
2Bhksmall 42.79999923706055 0 0 0
0%
2Bhksmall 45.0 0 0 0
0%
2Bhkultima 57.599998474121094 0 0 0
0%
3Bhk 81.93000030517578 0 0 0
0%
3Bhk Jodi 81.93000030517578 0 0 0
0%
3Bhk Ultima Jodi 100.86000061035156 0 0 0
0%
3Bhk Ultima Jodi 100.9000015258789 0 0 0
0%
3Bhkultimajodi 100.9000015258789 0 0 0
0%
4Bhk Jodi 100.9000015258789 0 0 0
0%
5Bhk Jodi 116.72000122070312 0 0 0
0%
5Bhkjodi 116.69999694824219 0 0 0
0%
5Bhkjodi 117.08999633789062 0 0 0
0%
5Bhkjodi 117.0999984741211 0 0 0
0%

Tower -26

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 48.8 16 16 0
100%
2 BHK 50.7 16 16 0
100%
2 BHK ultima 57.8 56 56 0
100%
2 BHK Ultima 62.4 4 4 0
100%
2 BHKSMALL 41.0 5 4 1
80%
2 BHKUltima 57.6 58 58 0
100%
3 BHK Ultima Jodi 100.9 8 8 0
100%
5 BHKJODI 117.1 1 1 0
100%

Tower -27

Type Carpet (sq.ft) Total Booked Available Status
1 BHK D 46.5 1 0 1
0%
2 BHK Optima 48.8 16 16 0
100%
2 BHK Optima 50.7 16 16 0
100%
2 BHK Ultima 57.6 56 54 2
96%
2 BHK Ultima 57.8 58 57 1
98%
2 BHK Ultima 62.4 1 1 0
100%
2 BHKSMALL 42.8 5 4 1
80%
3 BHKULTIMAJODI 100.9 3 3 0
100%
4 BHK Jodi 100.9 5 5 0
100%
5 BHKJODI 116.7 1 1 0
100%

Tower -28

Type Carpet (sq.ft) Total Booked Available Status
2 BHK Optima 48.83 17 17 0
100%
2 BHK Optima 50.72 17 17 0
100%
2 BHK UItima 57.83 54 54 0
100%
2 BHK Ultima 57.65 54 54 0
100%
2 BHK Ultima 62.45 3 3 0
100%
2 BHKSMALL 45.0 5 2 3
40%
3 BHK Ultima Jodi 100.86 7 7 0
100%
5 BHK JODI 116.72 2 2 0
100%
5 BHKJODI 117.09 2 2 0
100%

Tower -30

Type Carpet (sq.ft) Total Booked Available Status
2 BHK Optima 48.83 15 15 0
100%
2 BHK Optima 50.72 15 15 0
100%
2 BHK Ultima 57.65 58 58 0
100%
2 BHK Ultima 57.83 58 58 0
100%
2 BHK Ultima 62.45 2 2 0
100%
2 BHKSMALL 40.95 5 5 0
100%
3 BHK Ultima Jodi 100.86 9 9 0
100%

Tower -34

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 34.02 5 5 0
100%
1 BHK 38.47 34 34 0
100%
1 BHK 40.5 1 0 1
0%
1 BHK 42.47 34 34 0
100%
1 BHK 43.86 1 1 0
100%
2 BHK 56.59 29 28 1
97%
2 BHK 56.63 29 29 0
100%
2 BHK 62.45 2 2 0
100%
3 BHK 81.93 19 19 0
100%

Tower- 35

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 38.47 37 36 1
97%
1 BHK 42.47 37 36 1
97%
1 BHK 43.86 1 0 1
0%
1 BHK C 34.02 5 5 0
100%
2 BHK Ultima 56.63 29 28 1
97%
2 BHK Ultima 62.45 2 1 1
50%
2BHk Ultima 56.59 29 29 0
100%
3 BHK Jodi 81.93 16 15 1
94%

Construction Progress

TOWER -26

Basement (if any)100%

Tower -26

Excavation100%

TOWER -26

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Tower -26

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

TOWER -26

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Tower -26

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing80%

TOWER -26

Plinth100%
Podiums (if any) 0%

Tower -26

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

TOWER -26

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Tower -26

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

TOWER -26

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Tower -26

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

TOWER -27

Basement (if any)100%

Tower -27

Excavation100%

TOWER -27

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Tower -27

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

TOWER -27

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Tower -27

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing80%

TOWER -27

Plinth100%
Podiums (if any) 0%

Tower -27

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

TOWER -27

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Tower -27

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

TOWER -27

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Tower -27

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

TOWER -28

Basement (if any)100%

Tower -28

Excavation100%

TOWER -28

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Tower -28

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

TOWER -28

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Tower -28

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing80%

TOWER -28

Plinth100%
Podiums (if any) 0%

Tower -28

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

TOWER -28

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Tower -28

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

TOWER -28

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Tower -28

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

TOWER -30

Basement (if any)100%

Tower -30

Excavation100%

TOWER -30

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Tower -30

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

TOWER -30

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Tower -30

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing80%

TOWER -30

Plinth100%
Podiums (if any) 0%

Tower -30

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

TOWER -30

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Tower -30

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

TOWER -30

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Tower -30

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

TOWER -34

Basement (if any)100%

Tower -34

Excavation100%

TOWER -34

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Tower -34

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

TOWER -34

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Tower -34

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing80%

TOWER -34

Plinth100%
Podiums (if any) 0%

Tower -34

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

TOWER -34

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Tower -34

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

TOWER -34

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Tower -34

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

TOWER- 35

Basement (if any)100%

Tower- 35

Excavation100%

TOWER- 35

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Tower- 35

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

TOWER- 35

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Tower- 35

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing80%

TOWER- 35

Plinth100%
Podiums (if any) 0%

Tower- 35

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

TOWER- 35

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Tower- 35

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

TOWER- 35

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Tower- 35

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space 70%
Closed Parkings 40%
Community Buildings 95%
Electrical Meter Room, Sub-Station, Receiving Station 90%
Energy management 90%
Fire Protection And Fire Safety Requirements 100%
Landscaping & Tree Planting 60%
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP) 100%
Solid Waste Management And Disposal 100%
Storm Water Drains 100%
Street Lighting 40%
Treatment And Disposal Of Sewage And Sullage Water 100%
Water Conservation, Rain water Harvesting 90%
Water Supply 95%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.