01
Possession Timeline
Proposed
Mar 2027
Status
New
02
Unit Configurations (per MahaRERA)
ConfigurationCarpetIndicative Price
Shop Landowner215 ft²On request
Shop108–227 ft²On request
1 BHK391–460 ft²On request
1 BHK Landowner Share391–460 ft²On request
Configurations & carpet per MahaRERA filing · indicative price = locality rate × carpet (not the developer's quote).
💬 Verify current inventory with an advisor03
RERA Trust Record
MahaRERA No.
P51700056229
Registered
2024-05-22
Litigation
No reported in source
Escrow Bank
HDFC BANK
Architect
Tushar Tendolkar & Associate
Total FSI
2007
04
Buildings · 1 Wing(s)
Bldg 18 floors · — units
05
Land DNA · Genesis
Redevelopment / SRA / MHADA / MMRDA / Freehold — provenance from MPE's verification layer. The genesis no portal shows.
06
Location
📍 Villege Balyani
19.2764159,73.1981229
19.2764159,73.1981229
▸ Explore map & Street View — for verified buyers
07
Promoter & Professionals
INDERJEET KAUR KULVINDER SINGH CHAUHANDirector
KULVINDER SINGH MUKHTIYAR SINGH CHAUHANDirector
09
Construction Progress
42% avgBasement (if any)100%
Excavation100%
Plinth100%
X number of Basement(s) and Plinth100%
Stilt Floor50%
Slabs of Super Structure38%
X number of Slabs of Super Structure38%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.20%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
10
Amenities
Electrical Meter Room, Sub-Station, Receiving StationFire Protection And Fire Safety RequirementsOpen ParkingSewerage (Chamber, Lines, Septic Tank , STP)Storm Water DrainsWater Supply
12
Talk to our MahaRERA advisor
Tell our MahaRERA advisor what you need and they'll guide you on this project.
💬 Verify current project inventory08
Property Rates in Villege Balyani
Residential · Sale
₹10,000–15,000/sqft
Commercial · Sale
₹6,500–10,000/sqft
2 BHK · Rent
₹15,000–35,000/mo
Full rates
?
Frequently Asked Questions
When is possession of Lotus Residency?
As per MahaRERA, proposed possession is Mar 2027.
Is Lotus Residency RERA-registered?
Yes — MahaRERA registration P51700056229, registered 2024-05-22. The current MahaRERA source record reports no litigations.
Who is the developer?
Kulvinder Infrastructure
How do I book or get more details?
Tap WhatsApp or Call below to speak with a Mumbai Property Exchange advisor — serving Mumbai since 1995 · RERA-registered since 2017.