M
✓ MahaRERA P51700029231RERA: no litigation reported10
Units
2022
Possession
1
Buildings
Certificate Signed
Status
Lifecycle requires verification
Ask an advisor to verify the current project and inventory status.
Source stage: New · mapped resale: 0 · mapped rental: 0 · primary status: not confirmed
01
Possession Timeline
Proposed
Mar 2022
Status
New
02
Unit Configurations (per MahaRERA)
ConfigurationCarpetIndicative Price
2 BHK473–508 ft²On request
Configurations & carpet per MahaRERA filing · indicative price = locality rate × carpet (not the developer's quote).
💬 Verify current inventory with an advisor03
RERA Trust Record
MahaRERA No.
P51700029231
Registered
2023-03-06
Litigation
No reported in source
Escrow Bank
AXIS BANK
Architect
Ar Prasad K Garad
Total FSI
209
04
Buildings · 1 Wing(s)
Maa Gauri Apartment7 floors · — units
05
Land DNA · Genesis
Redevelopment / SRA / MHADA / MMRDA / Freehold — provenance from MPE's verification layer. The genesis no portal shows.
06
Location
📍 Ulhasnagar
▸ Explore map & Street View — for verified buyers
07
Promoter & Professionals
SIDDHIVINAYAK ENTERPRISENA
09
Construction Progress
91% avgBasement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%
Podiums (if any) 0%
10
Amenities
Electrical Meter Room, Sub-Station, Receiving StationFire Protection And Fire Safety RequirementsLandscaping & Tree PlantingLandscaping & Tree PlantingOpen ParkingSewerage (Chamber, Lines, Septic Tank , STP)Storm Water DrainsTreatment And Disposal Of Sewage And Sullage WaterWater Supply
12
Talk to our MahaRERA advisor
Tell our MahaRERA advisor what you need and they'll guide you on this project.
💬 Verify current project inventory14
More by Siddhivinayak Enterprise
15
MahaRERA projects nearby in Ulhasnagar
Regency Antilia Phase Viii Avana506 unitsRegency Antilia Phase Ix Avana475 unitsKohinoor Gardens349 unitsGolden City308 unitsCrosstown Ii C Wing307 unitsKohinoor Anaya202 unitsSeagreen Rudra199 unitsPushpraj Prime181 unitsSea Green Aurus142 unitsSunrise Towers124 unitsSharda Royce105 unitsElite Crystal102 units
?
Frequently Asked Questions
When is possession of Maa Gauri?
As per MahaRERA, proposed possession is Mar 2022.
Is Maa Gauri RERA-registered?
Yes — MahaRERA registration P51700029231, registered 2023-03-06. The current MahaRERA source record reports no litigations.
Who is the developer?
Siddhivinayak Enterprise — 23 projects tracked on Mumbai Property Exchange. View their track record ▸
How do I book or get more details?
Tap WhatsApp or Call below to speak with a Mumbai Property Exchange advisor — serving Mumbai since 1995 · RERA-registered since 2017.