📞 +91 98200 30685✉️
RERA: A51800043517

Mesacon Greens

by Mesacon Spaces Llp Partnership
Certificate SignedP51800054234

Project Information

RERA Certificate No.
P51800054234
Registration No.
REA51800151079
Registration Date
2024-01-09
Developer
Mesacon Spaces Llp Partnership
Architect
Ashim
Project Bank
HDFC BANK
Proposed Possession
2027-06-30
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Total Units
143
Units Sold
34 (24%)
Buildings
3
Project Area
4451.39 sq.m
Total FSI
14075.87
Approved FSI
12659.14
MahaRERA QR
Mesacon Greens
MahaRERA — P51800054234
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors13
Sanctioned13
🏠Habitable12
🔢Total Units58
🏡Residential58
📅Completion2027-06-30
🏗️Proposed Floors10
Sanctioned10
🏠Habitable9
🔢Total Units32
🏡Residential32
📅Completion2027-06-30
🏗️Proposed Floors13
Sanctioned13
🏠Habitable12
🔢Total Units53
🏡Residential53
📅Completion2027-06-30

Apartment Configurations

None

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2Bhk52.029998779296875000
0%
2Bhk66.43000030517578000
0%
2Bhk69.7699966430664000
0%
2Bhk71.6500015258789000
0%
2Bhk74.87999725341797000
0%
3Bhk74.87999725341797000
0%
3Bhk79.43000030517578000
0%
3Bhk81.75000
0%
3Bhk83.1500015258789000
0%
3Bhk91.0000
0%
3Bhk92.05999755859375000
0%
3Bhk93.73999786376953000
0%
3Bhk105.81999969482422000
0%
3Bhk112.41000366210938000
0%
3Bhk117.5199966430664000
0%
4Bhk140.92999267578125000
0%
4Bhk163.52000427246094000
0%
5Bhk &Amp; More511.4200134277344000
0%
Existing Member52.029998779296875000
0%
Existing Member57.31999969482422000
0%
Existing Member66.43000030517578000
0%
Existing Member69.7699966430664000
0%
Existing Member69.79000091552734000
0%
Existing Member74.87999725341797000
0%
Existing Member79.43000030517578000
0%
Existing Member79.5199966430664000
0%
Existing Member81.75000
0%
Existing Member83.1500015258789000
0%
Existing Member83.33000183105469000
0%
Existing Member86.12000274658203000
0%
Existing Member87.79000091552734000
0%
Existing Member91.13999938964844000
0%
Existing Member93.2699966430664000
0%
Existing Member93.73999786376953000
0%
Existing Member96.3499984741211000
0%
Existing Member98.19000244140625000
0%
Existing Member105.81999969482422000
0%
Existing Member112.41000366210938000
0%
Existing Member129.50999450683594000
0%
Existing Member623.6400146484375000
0%

A Wing

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK66.43413
25%
2 BHK71.65505
0%
3 BHK79.43303
0%
3 BHK83.15303
0%
3 BHK91.0303
0%
3 BHK105.82101
0%
3 BHK117.52505
0%
5 BHK & more511.42101
0%
EXISTING MEMBER66.43202
0%
EXISTING MEMBER79.43404
0%
EXISTING MEMBER79.52101
0%
EXISTING MEMBER83.15707
0%
EXISTING MEMBER83.3310010
0%
EXISTING MEMBER86.12101
0%
EXISTING MEMBER87.79101
0%
EXISTING MEMBER98.19101
0%
EXISTING MEMBER105.82404
0%

B Wing

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK69.77312
33%
3 BHK74.88303
0%
3 BHK93.74505
0%
EXISTING MEMBER69.77303
0%
EXISTING MEMBER69.79101
0%
EXISTING MEMBER74.88404
0%
EXISTING MEMBER93.74404
0%

C Wing

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK52.03202
0%
2 BHK74.88101
0%
3 BHK81.75505
0%
3 BHK92.06101
0%
3 BHK112.41505
0%
4 BHK140.93202
0%
4 BHK163.52202
0%
EXISTING MEMBER52.03707
0%
EXISTING MEMBER57.32101
0%
EXISTING MEMBER74.88707
0%
EXISTING MEMBER81.75202
0%
EXISTING MEMBER91.14101
0%
EXISTING MEMBER93.27707
0%
EXISTING MEMBER96.35101
0%
EXISTING MEMBER112.41303
0%
EXISTING MEMBER129.51101
0%
EXISTING MEMBER623.64101
0%

Construction Progress

A WING

Basement (if any)100%

A Wing

Excavation100%

A WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

A Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

A WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises2%

A Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing10%

A WING

Plinth100%
Podiums (if any) 100%

A Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

A WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure30%

A Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

A WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%

A Wing

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

B WING

Basement (if any)100%

B Wing

Excavation100%

B WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

B Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

B WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises3%

B Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing17%

B WING

Plinth100%
Podiums (if any) 100%

B Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

B WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure40%

B Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

B WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%

B Wing

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth70%
X number of Podiums0%
X number of Slabs of Super Structure0%

C WING

Basement (if any)100%

C Wing

Excavation100%

C WING

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

C Wing

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

C WING

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises4%

C Wing

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%

C WING

Plinth100%
Podiums (if any) 100%

C Wing

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

C WING

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure46%

C Wing

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

C WING

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks65%

C Wing

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth85%
X number of Podiums0%
X number of Slabs of Super Structure0%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.