✓ MahaRERA P51700053313RERA: no litigation reportedNamo Maxima
Viren Kishor Jain
📍 Water Supply Road, Kongaon, Thane · 421311
56
Units
2026
Possession
1
Buildings
Certificate Signed
Status
Lifecycle requires verification
Ask an advisor to verify the current project and inventory status.
Source stage: New · mapped resale: 0 · mapped rental: 0 · primary status: not confirmed
01
Possession Timeline
Proposed
Dec 2026
Status
New
02
Unit Configurations (per MahaRERA)
ConfigurationCarpetIndicative Price
Shop2,264 ft²On request
2 BHK3,653 ft²On request
1 BHK15,867 ft²On request
Configurations & carpet per MahaRERA filing · indicative price = locality rate × carpet (not the developer's quote).
💬 Verify current inventory with an advisor03
RERA Trust Record
MahaRERA No.
P51700053313
Registered
2023-10-27
Litigation
No reported in source
Escrow Bank
ICICI BANK LIMITED
Architect
Hk Design Consultants
Total FSI
2880
04
Buildings · 1 Wing(s)
Namo Maxima8 floors · — units
05
Land DNA · Genesis
Redevelopment / SRA / MHADA / MMRDA / Freehold — provenance from MPE's verification layer. The genesis no portal shows.
06
Location
📍 Water Supply Road, Kongaon
▸ Explore map & Street View — for verified buyers
09
Construction Progress
53% avgBasement (if any)100%
Excavation100%
Plinth100%
X number of Basement(s) and Plinth100%
Slabs of Super Structure88%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks88%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.71%
X number of Slabs of Super Structure71%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.13%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises13%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Podiums (if any) 0%
10
Amenities
Electrical Meter Room, Sub-Station, Receiving StationEnergy managementFire Protection And Fire Safety RequirementsLandscaping & Tree PlantingOpen ParkingSewerage (Chamber, Lines, Septic Tank , STP)Storm Water DrainsWater Conservation, Rain water HarvestingWater Supply
12
Talk to our MahaRERA advisor
Tell our MahaRERA advisor what you need and they'll guide you on this project.
💬 Verify current project inventory?
Frequently Asked Questions
When is possession of Namo Maxima?
As per MahaRERA, proposed possession is Dec 2026.
Is Namo Maxima RERA-registered?
Yes — MahaRERA registration P51700053313, registered 2023-10-27. The current MahaRERA source record reports no litigations.
Who is the developer?
Viren Kishor Jain
How do I book or get more details?
Tap WhatsApp or Call below to speak with a Mumbai Property Exchange advisor — serving Mumbai since 1995 · RERA-registered since 2017.