N
✓ MahaRERA P52000045492RERA: no litigation reported136
Units
2027
Possession
1
Buildings
Certificate Signed
Status
Lifecycle requires verification
Ask an advisor to verify the current project and inventory status.
Source stage: New · mapped resale: 0 · mapped rental: 0 · primary status: not confirmed
01
Possession Timeline
Proposed
May 2027
Status
New
02
Unit Configurations (per MahaRERA)
ConfigurationCarpetIndicative Price
2 BHK601–709 ft²On request
3 BHK859–895 ft²On request
Shop269–2,753 ft²On request
Configurations & carpet per MahaRERA filing · indicative price = locality rate × carpet (not the developer's quote).
💬 Verify current inventory with an advisor03
RERA Trust Record
MahaRERA No.
P52000045492
Registered
2022-05-24
Litigation
No reported in source
Escrow Bank
HDFC BANK
Architect
Satish V Ahuja
Total FSI
13503
04
Buildings · 1 Wing(s)
Neelkanth Auris17 floors · 136 units
05
Land DNA · Genesis
Redevelopment / SRA / MHADA / MMRDA / Freehold — provenance from MPE's verification layer. The genesis no portal shows.
06
Location
📍 Panvel West
19.0054547,73.1070640
19.0054547,73.1070640
▸ Explore map & Street View — for verified buyers
07
Promoter & Professionals
Bhavik GaudaniPartner
Hemant GaudaniPartner
Ramesh PatelPartner
Sunil GaudaniPartner
09
Construction Progress
92% avgBasement (if any)100%
Excavation100%
Plinth100%
Podiums (if any) 100%
Slabs of Super Structure100%
Stilt Floor 100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks87%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.82%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises75%
10
Amenities
Electrical Meter Room, Sub-Station, Receiving StationFire Protection And Fire Safety RequirementsLandscaping & Tree PlantingSewerage (Chamber, Lines, Septic Tank , STP)Water Conservation, Rain water HarvestingWater Supply
12
Talk to our MahaRERA advisor
Tell our MahaRERA advisor what you need and they'll guide you on this project.
💬 Verify current project inventory08
Property Rates in Panvel West
Residential · Sale
₹10,000–15,000/sqft
Commercial · Sale
₹6,000–10,000/sqft
2 BHK · Rent
₹15,000–35,000/mo
Full rates
14
More by Neelkanth Infracon
15
MahaRERA projects nearby in Panvel West
?
Frequently Asked Questions
When is possession of Neelkanth Auris?
As per MahaRERA, proposed possession is May 2027.
Is Neelkanth Auris RERA-registered?
Yes — MahaRERA registration P52000045492, registered 2022-05-24. The current MahaRERA source record reports no litigations.
Who is the developer?
Neelkanth Infracon — 17 projects tracked on Mumbai Property Exchange. View their track record ▸
How do I book or get more details?
Tap WhatsApp or Call below to speak with a Mumbai Property Exchange advisor — serving Mumbai since 1995 · RERA-registered since 2017.




