N
✓ MahaRERA P51700004963RERA: no litigation reported33
Units
2025
Possession
2
Buildings
Kept in Abeyance
Status
Lifecycle requires verification
Ask an advisor to verify the current project and inventory status.
Source stage: On-Going Project · mapped resale: 0 · mapped rental: 0 · primary status: not confirmed
01
Possession Timeline
Proposed
Jul 2025
Revised
Jul 2026
Status
On-Going Project
⚠ Possession revised later than originally proposed — per MahaRERA.
02
Unit Configurations (per MahaRERA)
ConfigurationCarpetIndicative Price
Resedential6,338 ft²On request
Resedential And9,015 ft²On request
Configurations & carpet per MahaRERA filing · indicative price = locality rate × carpet (not the developer's quote).
💬 Verify current inventory with an advisor03
RERA Trust Record
MahaRERA No.
P51700004963
Registered
—
Litigation
No reported in source
Escrow Bank
Kalyan Janta sahakari bank
Architect
—
Total FSI
1303
04
Buildings · 2 Wing(s)
New Kirtikar Building A— floors · — units
New Kirtikar Proposed Building B— floors · — units
05
Land DNA · Genesis
Redevelopment / SRA / MHADA / MMRDA / Freehold — provenance from MPE's verification layer. The genesis no portal shows.
06
Location
📍 Panchpakhadi
19.190001899999999,72.968201699999995
19.190001899999999,72.968201699999995
▸ Explore map & Street View — for verified buyers
09
Construction Progress
78% avgExcavation100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%
Overall Percentage of Completion of the work done For the entire Building /Wing99%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate90%
Excavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
10
Amenities
Electrical Meter Room, Sub-Station, Receiving StationEnergy managementFire Protection And Fire Safety RequirementsSewerage (Chamber, Lines, Septic Tank , STP)Solar waterSolid Waste Management And DisposalStreet LightingTreatment And Disposal Of Sewage And Sullage WaterWater Conservation, Rain water HarvestingWater Supplylift
12
Talk to our MahaRERA advisor
Tell our MahaRERA advisor what you need and they'll guide you on this project.
💬 Verify current project inventory15
MahaRERA projects nearby in Panchpakhadi
L and T Realty Evara Heights T2334 units25Hourlife - Tower C1319 unitsTen X Era Raymond Realty Tower A302 unitsL and T Realty Evara Heights T478 unitsL And T Realty Evara Heights T578 unitsRameshwar Co-Op Housing Society Ltd.69 unitsVeer Sapphire68 unitsKalika Heights Phase Ii56 unitsSatej Premises Co-Operative Society Limited52 unitsAnupam Chs. Ltd.51 unitsEmpire Presidency46 unitsShree Krupa Co Op Housing Society37 units
?
Frequently Asked Questions
When is possession of New Kirtikar Proposed?
As per MahaRERA, proposed possession is Jul 2025, revised to Jul 2026.
Is New Kirtikar Proposed RERA-registered?
Yes — MahaRERA registration P51700004963. The current MahaRERA source record reports no litigations.
Who is the developer?
Chaturthi Developers View their track record ▸
How do I book or get more details?
Tap WhatsApp or Call below to speak with a Mumbai Property Exchange advisor — serving Mumbai since 1995 · RERA-registered since 2017.