New Kirtikar Proposed

📍 Panchpakhadi, Thane · 400602
33
Units
2025
Possession
2
Buildings
Kept in Abeyance
Status
Lifecycle requires verification

Ask an advisor to verify the current project and inventory status.

Source stage: On-Going Project · mapped resale: 0 · mapped rental: 0 · primary status: not confirmed
01

Possession Timeline

Proposed
Jul 2025
Revised
Jul 2026
Status
On-Going Project
⚠ Possession revised later than originally proposed — per MahaRERA.
02

Unit Configurations (per MahaRERA)

ConfigurationCarpetIndicative Price
Resedential6,338 ft²On request
Resedential And9,015 ft²On request
Configurations & carpet per MahaRERA filing · indicative price = locality rate × carpet (not the developer's quote).
💬 Verify current inventory with an advisor
03

RERA Trust Record

MahaRERA No.
P51700004963
Registered
Litigation
No reported in source
Escrow Bank
Kalyan Janta sahakari bank
Architect
Total FSI
1303
04

Buildings · 2 Wing(s)

New Kirtikar Building A— floors · — units
New Kirtikar Proposed Building B— floors · — units
05

Land DNA · Genesis

Redevelopment / SRA / MHADA / MMRDA / Freehold — provenance from MPE's verification layer. The genesis no portal shows.
06

Location

📍 Panchpakhadi
19.190001899999999,72.968201699999995
▸ Explore map & Street View — for verified buyers
09

Construction Progress

78% avg
Excavation100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%
Overall Percentage of Completion of the work done For the entire Building /Wing99%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate90%
Excavation0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
10

Amenities

Electrical Meter Room, Sub-Station, Receiving StationEnergy managementFire Protection And Fire Safety RequirementsSewerage (Chamber, Lines, Septic Tank , STP)Solar waterSolid Waste Management And DisposalStreet LightingTreatment And Disposal Of Sewage And Sullage WaterWater Conservation, Rain water HarvestingWater Supplylift
12

Talk to our MahaRERA advisor

🏠 Discuss what you're looking for📍 Locality & project guidance🤝 Speak to a specialist

Tell our MahaRERA advisor what you need and they'll guide you on this project.

💬 Verify current project inventory
15

MahaRERA projects nearby in Panchpakhadi

?

Frequently Asked Questions

When is possession of New Kirtikar Proposed?

As per MahaRERA, proposed possession is Jul 2025, revised to Jul 2026.

Is New Kirtikar Proposed RERA-registered?

Yes — MahaRERA registration P51700004963. The current MahaRERA source record reports no litigations.

Who is the developer?

Chaturthi Developers View their track record ▸

How do I book or get more details?

Tap WhatsApp or Call below to speak with a Mumbai Property Exchange advisor — serving Mumbai since 1995 · RERA-registered since 2017.

SOURCE · MAHARERA + MUMBAI PROPERTY EXCHANGE
INDEPENDENT DATA · RERA A51800043517 · EST. 1995
WhatsAppEnquire ▸
🎯 AI Matchmaker
Tell us what you want in Panchpakhadi — get matched
RERA-verified options on WhatsApp. No spam, no fakes.
Our advisor replies on WhatsApp within 2 working hours (9am–8pm IST).
Sponsored
New launch
Akshar Elevate, Vashi
New launch in Vashi — ₹28,895/sq.ft
View project ›

📰 Latest Mumbai Property News

View all news →