📞 +91 98200 30685 ✉️
RERA: A51800043517

Omkar 1973 Worli

by Omkar Realtors And Developers Private Limited Company
Certificate Signed P51900003316
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51900003316
Registration No.
REA51900015422
Registration Date
2021-09-09
Developer
Omkar Realtors And Developers Private Limited Company
Architect
Anand Dhokay
Project Bank
YES BANK
Proposed Possession
2021-12-30
Revised Possession
2021-12-30
Extended Possession
1900-01-01
Units Sold
0
Buildings
2
Project Area
3372.00 sq.m
Total FSI
42410.00
Approved FSI
38200.00
MahaRERA QR
Omkar 1973 Worli
MahaRERA — P51900003316
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors27
Sanctioned27
📅Completion1900-01-01
🏗️Proposed Floors56
Sanctioned56
📅Completion1900-01-01

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
3 Bhk 124.0 0 0 0
0%
3 Bhk 129.0 0 0 0
0%
3 Bhk 134.0 0 0 0
0%
3 Bhk 145.0 0 0 0
0%
3 Bhk 232.0 0 0 0
0%
4 Bhk 200.0 0 0 0
0%
4 Bhk 232.0 0 0 0
0%
4 Bhk 238.0 0 0 0
0%
4 Bhk 258.0 0 0 0
0%
4 Bhk 264.0 0 0 0
0%
4 Bhk 277.0 0 0 0
0%
4 Bhk Large 286.0 0 0 0
0%
5 Bhk 205.0 0 0 0
0%
5 Bhk 287.0 0 0 0
0%
Duplex 1 1073.0 0 0 0
0%
Duplex 2 874.0 0 0 0
0%
Duplex Type 1 971.0 0 0 0
0%
Duplex Type 2 876.0 0 0 0
0%
Duplex Type 3 1209.0 0 0 0
0%
Simplex 483.0 0 0 0
0%
Simplex 699.0 0 0 0
0%
Simplex 1 581.0 0 0 0
0%
Simplex 2 614.0 0 0 0
0%
Simplex 3 794.0 0 0 0
0%
Triplex 1 1978.0 0 0 0
0%
Triplex 2 1367.0 0 0 0
0%
Triplex 3 1473.0 0 0 0
0%

Tower 2 54 Pt To 79Th Floor

Type Carpet (sq.ft) Total Booked Available Status
5 BHK 205.0 18 16 2
89%
5 BHK 287.0 9 9 0
100%
Duplex 1 1073.0 1 0 1
0%
Duplex 2 874.0 1 0 1
0%
Simplex 699.0 1 1 0
100%
Triplex 1 1978.0 1 0 1
0%
triplex 2 1367.0 1 0 1
0%
Triplex 3 1473.0 1 0 1
0%

Tower 3 16Th To 70Th Floor

Type Carpet (sq.ft) Total Booked Available Status
3 BHK 124.0 18 5 13
28%
3 BHK 129.0 32 12 20
38%
3 BHK 134.0 7 1 6
14%
3 BHK 145.0 10 4 6
40%
3 BHK 232.0 1 1 0
100%
4 BHK 200.0 1 0 1
0%
4 BHK 232.0 6 3 3
50%
4 BHK 238.0 1 0 1
0%
4 BHK 258.0 1 1 0
100%
4 BHK 264.0 5 3 2
60%
4 BHK 277.0 1 1 0
100%
4 BHK Large 286.0 8 4 4
50%
Duplex type 1 971.0 4 1 3
25%
Duplex type 2 876.0 1 1 0
100%
Duplex Type 3 1209.0 2 1 1
50%
Simplex 483.0 1 1 0
100%
Simplex 1 581.0 1 0 1
0%
Simplex 2 614.0 2 0 2
0%
Simplex 3 794.0 1 0 1
0%

Construction Progress

Tower 2 54 pt to 79th Floor

Basement (if any)100%

Tower 2 54 Pt To 79Th Floor

Excavation100%

Tower 2 54 pt to 79th Floor

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%

Tower 2 54 Pt To 79Th Floor

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate90%

Tower 2 54 pt to 79th Floor

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%

Tower 2 54 Pt To 79Th Floor

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises80%

Tower 2 54 pt to 79th Floor

Plinth100%
Podiums (if any) 0%

Tower 2 54 Pt To 79Th Floor

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises70%

Tower 2 54 pt to 79th Floor

Sanitary Fittings within the flats / premises70%
Slabs of Super Structure67%

Tower 2 54 Pt To 79Th Floor

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.75%

Tower 2 54 pt to 79th Floor

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%

Tower 2 54 Pt To 79Th Floor

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing90%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure67%

Tower 3 16th to 70th floor

Basement (if any)100%

Tower 3 16Th To 70Th Floor

Excavation100%

Tower 3 16th to 70th floor

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Tower 3 16Th To 70Th Floor

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

Tower 3 16th to 70th floor

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Tower 3 16Th To 70Th Floor

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing38%

Tower 3 16th to 70th floor

Plinth100%
Podiums (if any) 100%

Tower 3 16Th To 70Th Floor

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

Tower 3 16th to 70th floor

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure50%

Tower 3 16Th To 70Th Floor

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.30%

Tower 3 16th to 70th floor

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%

Tower 3 16Th To 70Th Floor

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure50%

RERA Registered Amenities

Aggregate area of recreational Open Space
Club House 60%
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 50%
Energy management
Fire Protection And Fire Safety Requirements 70%
Fitness Centre gym 90%
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP) 70%
Solid Waste Management And Disposal 50%
Storm Water Drains 70%
Street Lighting
swimming pool childrens play area rock climbing and other amenities 70%
Treatment And Disposal Of Sewage And Sullage Water 70%
Water Conservation, Rain water Harvesting 50%
Water Supply 70%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.