📞 +91 98200 30685 ✉️
RERA: A51800043517

Piramal Aranya - Wing C

by Glider Buildcon Realtors Private Limited Company
Certificate Signed P51900020330
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51900020330
Registration No.
REA51900054846
Registration Date
2023-12-05
Developer
Glider Buildcon Realtors Private Limited Company
Project Bank
HDFC BANK
Proposed Possession
2027-08-28
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Total Units
337
Units Sold
251 (74%)
Buildings
1
Project Area
1086.00 sq.m
Total FSI
27762.00
Approved FSI
27762.00
MahaRERA QR
Piramal Aranya - Wing C
MahaRERA — P51900020330
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors66
Sanctioned66
🏠Habitable44
🔢Total Units337
🏡Residential337
⬇️Basements3
🚗Open Parking11
🅿️Closed Parking476
📅Completion2027-02-28

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
2Bhk 57.0 0 0 0
0%
2Bhk 60.0 0 0 0
0%
2Bhk 61.0 0 0 0
0%
2Bhk 62.0 0 0 0
0%
2Bhk 64.0 0 0 0
0%
2Bhk 65.0 0 0 0
0%
3Bhk 79.0 0 0 0
0%
3Bhk 80.0 0 0 0
0%

Piramal Aranya - Wing C

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 57.0 43 42 1
98%
2 BHK 60.0 24 13 11
54%
2 BHK 61.0 52 30 22
58%
2 BHK 62.0 43 7 36
16%
2 BHK 64.0 26 10 16
38%
2 BHK 65.0 60 30 30
50%
3 BHK 79.0 44 19 25
43%
3 BHK 80.0 44 20 24
45%

Construction Progress

Piramal Aranya - Wing C

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate8%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises50%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises2%
Sanitary Fittings within the flats / premises50%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.68%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing11%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.