Rusttagi Aarambha Phase-Ii

by Rustagi Estates Private Limited Company
Certificate SignedP51700034078
Rusttagi Aarambha Phase-IiProject photos will appear here when available.

Project Information

RERA Certificate No.
P51700034078
Registration No.
REA51700104856
Registration Date
2024-05-22
Developer
Rustagi Estates Private Limited Company
Architect
Ub Architects
Project Bank
HDFC BANK
Proposed Possession
2026-02-22
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Total Units
298
Units Sold
273 (92%)
Buildings
3
Project Area
7346.52 sq.m
Total FSI
17873.40
Approved FSI
17873.40
MahaRERA QR
Rusttagi Aarambha Phase-Ii
MahaRERA โ€” P51700034078
Scan to verify on MahaRERA portal

Wing-wise Details

๐Ÿ—๏ธProposed Floors3
โœ…Sanctioned3
๐Ÿ Habitable3
๐Ÿ”ขTotal Units4
๐ŸขNon-Residential4
๐Ÿ—๏ธProposed Floors13
โœ…Sanctioned13
๐Ÿ Habitable13
๐Ÿ”ขTotal Units141
๐ŸกResidential141
๐Ÿ—๏ธProposed Floors14
โœ…Sanctioned14
๐Ÿ Habitable14
๐Ÿ”ขTotal Units153
๐ŸกResidential153

Apartment Configurations

BUILDING 1

TypeCarpet (sq.ft)TotalBookedAvailableStatus
Shop76.71101
0%
Shop848.63101
0%
Shop906.85101
0%
Shop968.31101
0%

BUILDING 2

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK29.481411365
96%

BUILDING 4

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK29.4815311736
76%

Construction Progress

BUILDING 1

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
Stilt Floor100%

BUILDING 2

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

BUILDING 4

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

RERA Registered Amenities

โฌœAggregate area of recreational Open Space
โœ…Community Buildings
โœ…Electrical meter room, sub-station, receiving station60%
โœ…Energy managemcnt
โœ…Fire protection and fire safety requirements70%
โœ…Internal Roads & Footpaths90%
โœ…Landscaping & Tree Planting50%
โœ…OPEN CAR PARKING
โœ…OPEN SCOOTER PARKING
โœ…OTHERS
โฌœOpen Parking
โœ…STILT SCOOTER PARKING
โœ…Sewerage (Chamber, Lines, Septic Tank , STP)70%
โœ…Solid Waste Management And Disposal
โœ…Storm Water Drains100%
โœ…Street Lighting10%
โœ…Treatment And Disposal Of Sewage And Sullage Water10%
โœ…Water Supply60%
โœ…Water conservation /Rain water harvesting80%