SHREERAM COMPLEX

by ZINAL BUILDERS AND DEVELOPERS Partnership
Certificate SignedP99000049212
SHREERAM COMPLEXProject photos will appear here when available.

Project Information

RERA Certificate No.
P99000049212
Registration No.
REA99000128412
Registration Date
2023-02-03
Developer
ZINAL BUILDERS AND DEVELOPERS Partnership
Architect
CHIRAG MISTRY AND ASSOCIATES
Project Bank
IDBI BANK
Proposed Possession
2028-04-30
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Total Units
171
Units Sold
86 (50%)
Buildings
3
Project Area
3000.00 sq.m
Total FSI
6555.61
Approved FSI
6555.61
MahaRERA QR
SHREERAM COMPLEX
MahaRERA — P99000049212
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors8
✅Sanctioned8
🏠Habitable8
🔢Total Units68
🏡Residential68
🏗️Proposed Floors6
✅Sanctioned6
🏠Habitable6
🔢Total Units57
🏡Residential57
🏗️Proposed Floors6
✅Sanctioned6
🏠Habitable6
🔢Total Units46
🏡Residential46

Apartment Configurations

BLDG NO 1 A WING

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK29.58101
0%
1BHK30.13707
0%
1BHK31.25101
0%
1BHK31.849049
0%
1RK25.61707
0%
Shop20.53101
0%
Shop23.18101
0%
Shop29.9101
0%

BLDG NO 2 A AND B WING

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK26.491239
25%
1BHK29.06231112
48%
1BHK29.111011
0%
1RK21.61129
18%

BLDG NO 3 A AND B WING

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK29.0623518
22%
1RK21.623221
9%

Construction Progress

BLDG NO 1 A WING

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises95%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
Stilt Floor0%

BLDG NO 2 A AND B WING

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises95%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
Stilt Floor0%

BLDG NO 3 A AND B WING

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises95%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
Stilt Floor100%

RERA Registered Amenities

⬜Aggregate area of recreational Open Space
⬜Community Buildings
✅Electrical meter room, sub-station, receiving station95%
⬜Energy managemcnt
⬜Fire protection and fire safety requirements
✅Internal Roads & Footpaths95%
⬜Landscaping & Tree Planting
⬜Open Parking
✅Sewerage (Chamber, Lines, Septic Tank , STP)100%
⬜Solid Waste Management And Disposal
✅Storm Water Drains80%
✅Street Lighting
⬜Treatment And Disposal Of Sewage And Sullage Water
✅Water Supply90%
✅Water conservation /Rain water harvesting90%