📞 +91 98200 30685 ✉️
RERA: A51800043517

REDEVELOPMENT OF LOITA KUNJ CHS LTD

by ORRA REALTORS PRIVATE LIMITED Company
Certificate Signed P51800009064
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51800009064
Registration No.
REA51800015894
Registration Date
2021-09-09
Developer
ORRA REALTORS PRIVATE LIMITED Company
Architect
B R Gandhi
Proposed Possession
2024-12-30
Revised Possession
2024-12-30
Extended Possession
1900-01-01
Units Sold
0
Buildings
1
Project Area
814.40 sq.m
Total FSI
2417.46
Approved FSI
997.73
MahaRERA QR
REDEVELOPMENT OF LOITA KUNJ CHS LTD
MahaRERA — P51800009064
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors18
Sanctioned18
⬇️Basements1
🚗Open Parking9
🅿️Closed Parking1
📅Completion2024-12-30

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
2Bhk 61.97999954223633 0 0 0
0%
3Bhk 86.5199966430664 0 0 0
0%
Existingtenant 2 Bhk 61.97999954223633 0 0 0
0%
Existingtenant 3 Bhk 86.5199966430664 0 0 0
0%

Lotia Kunj Chs Ltd

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 61.98 10 6 4
60%
3 BHK 86.52 5 1 4
20%
ExistingTenant 2 BHK 61.98 5 0 5
0%
ExistingTenant 3 BHK 86.52 10 0 10
0%

Construction Progress

LOTIA KUNJ CHS LTD

Basement (if any)100%

Lotia Kunj Chs Ltd

Excavation100%

LOTIA KUNJ CHS LTD

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%

Lotia Kunj Chs Ltd

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate15%

LOTIA KUNJ CHS LTD

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.15%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises65%

Lotia Kunj Chs Ltd

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises65%

LOTIA KUNJ CHS LTD

Plinth100%
Podiums (if any) 0%

Lotia Kunj Chs Ltd

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises40%

LOTIA KUNJ CHS LTD

Sanitary Fittings within the flats / premises40%
Slabs of Super Structure71%

Lotia Kunj Chs Ltd

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.65%

LOTIA KUNJ CHS LTD

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks65%

Lotia Kunj Chs Ltd

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing60%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure71%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements 15%
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP) 50%
Solid Waste Management And Disposal
Storm Water Drains 100%
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.