9 Marina vs Platinum Vibe
A detailed comparison of 9 Marina in Andheri West and Platinum Vibe in Andheri West. Compare pricing, RERA status, configurations, possession dates, and amenities to make an informed decision.

9 Marina

Platinum Vibe
Compare sizes and total prices
Recorded configurations and indicative prices. Unit availability, taxes, charges and the final quote need confirmation.
| Configuration | 9 Marina | Platinum Vibe |
|---|---|---|
| 2 BHK · carpet area | 880 sq ft | Not recorded |
| 2 BHK · indicative total price | ₹3.96 crore | Not recorded |
| 2½ BHK · carpet area | Not recorded | 880 sq ft |
| 2½ BHK · indicative total price | Not recorded | ₹3.96 crore |
| 3 BHK · carpet area | 1,059 sq ft / 1,118 sq ft | 1,115 sq ft / 1,180 sq ft |
| 3 BHK · indicative total price | ₹4.76 crore / ₹5.03 crore | ₹5.01 crore / ₹5.31 crore |
Project record updates: 9 Marina — 26 June 2026; Platinum Vibe — 15 August 2026. These dates do not confirm when a price was last verified. “Not recorded” does not mean unavailable.
📊 Side-by-Side Comparison
| Parameter | 9 Marina | Platinum Vibe |
|---|---|---|
| Location | Andheri West, Model Town, Mudran Press Colony, | Andheri West, Model Town, Versova |
| Developer | MDM Realty Group | Platinum Corp |
| Construction Status | Under Construction | Under Construction |
| Indicative rate per sq.ft. | ₹45,000 | ₹45,000 |
| Recorded possession target | Dec 2027 | Dec 2030 |
| Configurations | 2 BHK, 3 BHK | 2½ BHK, 3 BHK |
| RERA Number | P51800076983 | PR1180002600307 |
| Project Type | Residential | Residential |
| Floors | 20 | 21 |
| Recorded feature labels | 11 | 24 |
Plans and brochures
9 Marina
No verified floor-plan link is currently recorded.
Brochure recorded; request the latest version from our advisor.
Request documents from an advisorPlatinum Vibe
No verified floor-plan link is currently recorded.
A brochure is not currently recorded here. Our advisor can check the correct project documents.
Request documents from an advisorFacilities and specifications
9 Marina
Air Conditioned LobbyAluminium Sliding WindowsConcealed PlumbingConcealed WiringGrand entrance lobbyHigh speed elevatorsImported Sanitary FittingsModular KitchenPOP finished wallsReception DeskSecurity Help DeskPlatinum Vibe
24x7 SecurityAC LiftsCCTVClubhouseConcealed PlumbingConcealed WiringFire SafetyGardenGated CommunityGymnasiumIndoor GamesJogging TrackKids Play AreaModern ElevatorsModular KitchenMultipurpose HallParty LawnPower BackupSenior Citizen AreaSky LoungeSports CourtSwimming PoolWater HarvestingYoga Room❓ Frequently Asked Questions
How do the recorded prices compare?
Both projects have the same recorded indicative rate of ₹45,000/sq ft. Compare the configuration-level total prices and carpet areas above. A lower rate does not necessarily mean a lower total price; confirm the exact unit and charges with an advisor.
What are the recorded possession targets?
9 Marina: Dec 2027. Platinum Vibe: Dec 2030. These are recorded targets, not delivery guarantees. Confirm the applicable tower and phase on MahaRERA and with the developer.
Which RERA records apply?
9 Marina: P51800076983. Platinum Vibe: PR1180002600307. Verify the relevant project phase on the official MahaRERA website.
How should I compare the listed features?
These records mix facilities and specifications, and may use different names for similar features. A longer list does not establish a better project. Confirm which features apply to your tower and unit, and compare the ones that matter to you.




