Project Information

RERA Certificate No.
P51800052607
Registration No.
REA51800145608
Registration Date
2023-09-11
Developer
Alliance City Developers Realtors Pvt Ltd
Architect
The Design Studio
Project Bank
PUNJAB NATIONAL BANK
Proposed Possession
2027-02-28
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Total Units
61
Units Sold
13 (21%)
Buildings
1
Project Area
1128.20 sq.m
Total FSI
2325.98
Approved FSI
2325.98
MahaRERA QR
Alliance Abhimanyu
MahaRERA — P51800052607
Scan to verify on MahaRERA portal

Wing-wise Details

🅿️Closed Parking67
📅Completion2027-02-28

Apartment Configurations

Alliance Abhimanyu

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK55.74606
0%
2 BHK60.39330
100%
2 BHK EXISITING MEMB49.3321210
100%
3 BHK63.64202
0%
3 BHK63.73440
100%
3 BHK76.27211
50%

Construction Progress

ALLIANCE ABHIMANYU

Basement (if any)100%

Alliance Abhimanyu

Excavation100%

ALLIANCE ABHIMANYU

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Alliance Abhimanyu

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

ALLIANCE ABHIMANYU

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%

Alliance Abhimanyu

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing40%

ALLIANCE ABHIMANYU

Plinth100%
Podiums (if any) 100%

Alliance Abhimanyu

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

ALLIANCE ABHIMANYU

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure82%

Alliance Abhimanyu

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

ALLIANCE ABHIMANYU

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Alliance Abhimanyu

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure0%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.