Adhrit

by Mundara Developers Partnership
Certificate SignedP51800009600

Project Information

RERA Certificate No.
P51800009600
Registration No.
REA51800015133
Registration Date
2025-08-12
Developer
Mundara Developers Partnership
Architect
Vivek Bhole Architects Pvt.Ltd
Project Bank
DCB BANK LIMITED
Proposed Possession
2023-10-30
Revised Possession
2023-10-30
Extended Possession
2025-07-31
Total Units
472
Units Sold
128 (27%)
Buildings
5
Project Area
7511.28 sq.m
Total FSI
26007.64
Approved FSI
25227.80
MahaRERA QR
Adhrit
MahaRERA — P51800009600
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors51
Sanctioned51
🏠Habitable42
🔢Total Units201
🏡Residential197
🏢Non-Residential4
⬇️Basements1
🅿️Closed Parking273
📅Completion2023-10-30
🏗️Proposed Floors8
Sanctioned8
🏠Habitable8
🔢Total Units64
🏡Residential64
📅Completion2022-10-31
🏗️Proposed Floors8
Sanctioned8
🏠Habitable8
🔢Total Units64
🏡Residential64
📅Completion2023-10-30
🏗️Proposed Floors8
Sanctioned8
🏠Habitable8
🔢Total Units79
🏡Residential79
📅Completion2022-10-31
🏗️Proposed Floors9
Sanctioned9
🏠Habitable8
🔢Total Units64
🏡Residential64
🅿️Closed Parking14
📅Completion2023-10-30

Apartment Configurations

Adhrit

TypeCarpet (sq.ft)TotalBookedAvailableStatus
100274.0110
100%
100373.94110
100%
100474.53110
100%
100693.98110
100%
10274.0110
100%
103115.08101
0%
104104.03101
0%
10693.98110
100%
110174.75101
0%
110474.53110
100%
110593.98110
100%
110693.98110
100%
120174.75110
100%
120274.0110
100%
120474.53110
100%
120693.98110
100%
130174.75110
100%
130274.0110
100%
130373.94110
100%
130474.53110
100%
130593.98110
100%
130693.98110
100%
140373.94110
100%
140474.53110
100%
140593.98110
100%
140693.98110
100%
150174.75110
100%
150373.94110
100%
150474.53110
100%
150693.98110
100%
160373.94110
100%
160593.98110
100%
160693.98101
0%
170174.75110
100%
170274.0110
100%
170693.98110
100%
180174.75110
100%
180274.0110
100%
180373.94110
100%
180474.53110
100%
180593.98110
100%
180693.98101
0%
190274.0110
100%
190593.98110
100%
190693.98110
100%
200373.94110
100%
200474.53110
100%
200593.98110
100%
200693.98110
100%
20174.75101
0%
20274.0101
0%
20474.53110
100%
210174.75110
100%
210274.0110
100%
2103449.25110
100%
210593.98110
100%
210693.98110
100%
220174.75110
100%
220274.0110
100%
220693.98110
100%
230174.75110
100%
230274.0101
0%
230593.98110
100%
230693.98110
100%
240174.75110
100%
240274.0110
100%
240373.94101
0%
240474.53101
0%
240593.98110
100%
240693.98110
100%
250174.75110
100%
250274.0110
100%
250373.94101
0%
250474.53110
100%
250593.98110
100%
250693.98110
100%
260373.94110
100%
260474.53101
0%
260596.02110
100%
260696.02110
100%
270174.75110
100%
270274.0110
100%
270373.94101
0%
270474.51101
0%
270596.02110
100%
270696.02110
100%
280179.32110
100%
280278.57110
100%
280378.51110
100%
280479.1110
100%
2805100.84110
100%
290278.57101
0%
290378.51110
100%
290479.1110
100%
300179.32110
100%
300278.57110
100%
300378.51110
100%
300479.1110
100%
3005100.84110
100%
3006100.84110
100%
30174.75101
0%
30274.0110
100%
30593.98110
100%
30693.98110
100%
310179.32110
100%
310278.57110
100%
310378.51110
100%
310479.1110
100%
320179.32101
0%
320278.57110
100%
320378.51110
100%
320479.1110
100%
330179.32101
0%
330278.57110
100%
330378.51110
100%
330479.1110
100%
3305100.84110
100%
3306100.84110
100%
340179.32101
0%
340278.57101
0%
340378.51110
100%
340479.1110
100%
3405100.84110
100%
3406100.84110
100%
40174.75110
100%
40274.0110
100%
40373.94101
0%
40474.53101
0%
40593.98110
100%
40693.98101
0%
50174.75110
100%
50373.94101
0%
50474.53110
100%
505A42.79101
0%
505B45.47101
0%
506A45.47101
0%
506B42.81101
0%
60174.75110
100%
60373.94110
100%
60474.53110
100%
605A42.79101
0%
605B45.47101
0%
60693.98110
100%
70174.75101
0%
70274.0110
100%
70373.94110
100%
70474.53110
100%
70693.98110
100%
80174.75110
100%
80274.0110
100%
80373.94110
100%
80474.53110
100%
90174.75110
100%
90274.0110
100%
90693.98110
100%
E Level19.83110
100%
E Level227.99110
100%
Kitchen Area66.97101
0%
Reserved for Owners3441.6842042
0%
Service Area19.83101
0%

Pushapak 3 Rehab

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 RK20.964064
0%

Pushpak 1 Rehab

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1RK20.964064
0%

Pushpak 2 Rehab

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 RK20.979079
0%

Rehab / Composite Building No 5

TypeCarpet (sq.ft)TotalBookedAvailableStatus
60127.87101
0%
60227.87101
0%
70127.87101
0%
70227.87101
0%
70327.87101
0%
70427.87101
0%
70527.87101
0%
70627.87101
0%
70727.87101
0%
70827.87101
0%
80127.87101
0%
80227.87101
0%
80327.87101
0%
80427.87101
0%
80527.87101
0%
80627.87101
0%
80727.87101
0%
80827.87101
0%
PAP Flats1254.1845045
0%
Welfare Centre27.87101
0%

None

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 Rk20.899999618530273000
0%
100274.0000
0%
100373.94000244140625000
0%
100474.52999877929688000
0%
100693.9800033569336000
0%
10274.0000
0%
103115.08000183105469000
0%
104104.02999877929688000
0%
10693.9800033569336000
0%
110174.75000
0%
110474.52999877929688000
0%
110593.9800033569336000
0%
110693.9800033569336000
0%
120174.75000
0%
120274.0000
0%
120474.52999877929688000
0%
120693.9800033569336000
0%
130174.75000
0%
130274.0000
0%
130373.94000244140625000
0%
130474.52999877929688000
0%
130593.9800033569336000
0%
130693.9800033569336000
0%
140373.94000244140625000
0%
140474.52999877929688000
0%
140593.9800033569336000
0%
140693.9800033569336000
0%
150174.75000
0%
150373.94000244140625000
0%
150474.52999877929688000
0%
150693.9800033569336000
0%
160373.94000244140625000
0%
160593.9800033569336000
0%
160693.9800033569336000
0%
170174.75000
0%
170274.0000
0%
170693.9800033569336000
0%
180174.75000
0%
180274.0000
0%
180373.94000244140625000
0%
180474.52999877929688000
0%
180593.9800033569336000
0%
180693.9800033569336000
0%
190274.0000
0%
190593.9800033569336000
0%
190693.9800033569336000
0%
1Rk20.899999618530273000
0%
200373.94000244140625000
0%
200474.52999877929688000
0%
200593.9800033569336000
0%
200693.9800033569336000
0%
20174.75000
0%
20274.0000
0%
20474.52999877929688000
0%
210174.75000
0%
210274.0000
0%
2103449.25000
0%
210593.9800033569336000
0%
210693.9800033569336000
0%
220174.75000
0%
220274.0000
0%
220693.9800033569336000
0%
230174.75000
0%
230274.0000
0%
230593.9800033569336000
0%
230693.9800033569336000
0%
240174.75000
0%
240274.0000
0%
240373.94000244140625000
0%
240474.52999877929688000
0%
240593.9800033569336000
0%
240693.9800033569336000
0%
250174.75000
0%
250274.0000
0%
250373.94000244140625000
0%
250474.52999877929688000
0%
250593.9800033569336000
0%
250693.9800033569336000
0%
260373.94000244140625000
0%
260474.52999877929688000
0%
260596.0199966430664000
0%
260696.0199966430664000
0%
270174.75000
0%
270274.0000
0%
270373.94000244140625000
0%
270474.51000213623047000
0%
270596.0199966430664000
0%
270696.0199966430664000
0%
280179.31999969482422000
0%
280278.56999969482422000
0%
280378.51000213623047000
0%
280479.0999984741211000
0%
2805100.83999633789062000
0%
290278.56999969482422000
0%
290378.51000213623047000
0%
290479.0999984741211000
0%
300179.31999969482422000
0%
300278.56999969482422000
0%
300378.51000213623047000
0%
300479.0999984741211000
0%
3005100.83999633789062000
0%
3006100.83999633789062000
0%
30174.75000
0%
30274.0000
0%
30593.9800033569336000
0%
30693.9800033569336000
0%
310179.31999969482422000
0%
310278.56999969482422000
0%
310378.51000213623047000
0%
310479.0999984741211000
0%
320179.31999969482422000
0%
320278.56999969482422000
0%
320378.51000213623047000
0%
320479.0999984741211000
0%
330179.31999969482422000
0%
330278.56999969482422000
0%
330378.51000213623047000
0%
330479.0999984741211000
0%
3305100.83999633789062000
0%
3306100.83999633789062000
0%
340179.31999969482422000
0%
340278.56999969482422000
0%
340378.51000213623047000
0%
340479.0999984741211000
0%
3405100.83999633789062000
0%
3406100.83999633789062000
0%
40174.75000
0%
40274.0000
0%
40373.94000244140625000
0%
40474.52999877929688000
0%
40593.9800033569336000
0%
40693.9800033569336000
0%
50174.75000
0%
50373.94000244140625000
0%
50474.52999877929688000
0%
505A42.790000915527344000
0%
505B45.470001220703125000
0%
506A45.470001220703125000
0%
506B42.810001373291016000
0%
60127.8700008392334000
0%
60174.75000
0%
60227.8700008392334000
0%
60373.94000244140625000
0%
60474.52999877929688000
0%
605A42.790000915527344000
0%
605B45.470001220703125000
0%
60693.9800033569336000
0%
70127.8700008392334000
0%
70174.75000
0%
70227.8700008392334000
0%
70274.0000
0%
70327.8700008392334000
0%
70373.94000244140625000
0%
70427.8700008392334000
0%
70474.52999877929688000
0%
70527.8700008392334000
0%
70627.8700008392334000
0%
70693.9800033569336000
0%
70727.8700008392334000
0%
70827.8700008392334000
0%
80127.8700008392334000
0%
80174.75000
0%
80227.8700008392334000
0%
80274.0000
0%
80327.8700008392334000
0%
80373.94000244140625000
0%
80427.8700008392334000
0%
80474.52999877929688000
0%
80527.8700008392334000
0%
80627.8700008392334000
0%
80727.8700008392334000
0%
80827.8700008392334000
0%
90174.75000
0%
90274.0000
0%
90693.9800033569336000
0%
E Level19.829999923706055000
0%
E Level227.99000549316406000
0%
Kitchen Area66.97000122070312000
0%
Pap Flats1254.1800537109375000
0%
Reserved For Owners3441.679931640625000
0%
Service Area19.829999923706055000
0%
Welfare Centre27.8700008392334000
0%

Construction Progress

ADHRIT

Basement (if any)100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.35%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises84%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises33%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks76%

Adhrit

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate20%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises78%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises20%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.40%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing35%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure91%

PUSHAPAK 3 REHAB

Basement (if any)100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

PUSHPAK 1 REHAB

Basement (if any)100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

PUSHPAK 2 REHAB

Basement (if any)100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Pushapak 3 Rehab

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

Pushpak 1 Rehab

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

Pushpak 2 Rehab

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

REHAB / COMPOSITE BUILDING NO 5

Basement (if any)100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth100%
Podiums (if any) 0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Rehab / Composite Building No 5

Excavation100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing27%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor70%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure0%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station65%
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting10%
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)40%
Solid Waste Management And Disposal
Storm Water Drains35%
Street Lighting35%
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply35%
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.