Project Information

RERA Certificate No.
P51800034372
Registration No.
REA51800104875
Registration Date
2022-04-04
Developer
TRISONS BUILDERS Partnership
Architect
Pushkar Bhanuprasad Suthar
Project Bank
HDFC BANK
Proposed Possession
2024-12-31
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Units Sold
0
Buildings
1
Project Area
846.20 sq.m
Total FSI
2319.83
Approved FSI
1733.62
MahaRERA QR
ANNAVISTA
MahaRERA — P51800034372
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors10
Sanctioned10
⬇️Basements1
🚗Open Parking5
🅿️Closed Parking1
📅Completion2024-12-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
1Bhk 34.880001068115234 0 0 0
0%
2Bhk 69.73999786376953 0 0 0
0%
2Bhk 71.83999633789062 0 0 0
0%
2Bhk 72.0199966430664 0 0 0
0%
3Bhk 99.95999908447266 0 0 0
0%
3Bhk 103.63999938964844 0 0 0
0%

Annavista

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 34.88 1 0 1
0%
2 BHK 69.74 7 0 7
0%
2 BHK 71.84 5 0 5
0%
2 BHK 72.02 5 0 5
0%
3 BHK 99.96 5 0 5
0%
3 BHK 103.64 4 0 4
0%

Construction Progress

ANNAVISTA

Basement (if any)100%

Annavista

Excavation100%

ANNAVISTA

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%

Annavista

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate40%

ANNAVISTA

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%

Annavista

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises85%

ANNAVISTA

Plinth100%
Podiums (if any) 0%

Annavista

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

ANNAVISTA

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%

Annavista

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

ANNAVISTA

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Annavista

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing90%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements 100%
FITNESS CENTER
Landscaping & Tree Planting
LIFTS LIFTLOBBY ENTRANCE LOBBY
Open Parking
SECURITY CABIN
SERVANT TOILET
Sewerage (Chamber, Lines, Septic Tank , STP)
SOCIETY ROOM
Solid Waste Management And Disposal
SRAIRCASE
Storm Water Drains 100%
Street Lighting
SWIMMING POOL AND COMMON TARRACE
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting 100%
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.