Arkade Eden

by ARKADE DEVELOPERS LIMITED Company
Certificate Signed P51800054908
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51800054908
Registration No.
REA51800152744
Registration Date
2024-02-15
Developer
ARKADE DEVELOPERS LIMITED Company
Architect
A R Design Studio
Project Bank
ICICI BANK LIMITED
Proposed Possession
2026-12-31
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Total Units
132
Units Sold
38 (29%)
Buildings
2
Project Area
3101.00 sq.m
Total FSI
9209.85
Approved FSI
9209.28
MahaRERA QR
Arkade Eden
MahaRERA — P51800054908
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors22
Sanctioned22
🏠Habitable20
🔢Total Units58
🏡Residential58
📅Completion2026-12-31
🏗️Proposed Floors22
Sanctioned22
🏠Habitable20
🔢Total Units74
🏡Residential74
📅Completion2026-12-31

Apartment Configurations

Wing A

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 66.85 11 11 0
100%
2 BHK 66.94 5 5 0
100%
2 BHK 67.59 8 4 4
50%
2 BHK 67.67 13 7 6
54%
2.5 BHK 77.88 1 1 0
100%
3 BHK 92.02 20 11 9
55%

Wing B

Type Carpet (sq.ft) Total Booked Available Status
1.5 BHK 46.22 39 39 0
100%
2 BHK 55.49 12 12 0
100%
2 BHK 56.54 1 1 0
100%
2 BHK 61.32 5 3 2
60%
2 BHK 61.35 17 7 10
41%

Construction Progress

Wing A

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises7%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Plinth0%
Podiums (if any) 65%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure38%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.6%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks6%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums65%
X number of Slabs of Super Structure5%

Wing B

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises3%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Plinth0%
Podiums (if any) 65%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure38%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.6%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks6%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums65%
X number of Slabs of Super Structure5%

RERA Registered Amenities

Aggregate area of recreational Open Space
Car Parking System
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Fitness Centre and Society Office
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal 50%
Storm Water Drains
Street Lighting
Swimming Pool
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.