Cons 1221 MIG T/S and 100 Shops S. No. 113 (pt), CTS 356/A (pt) Pocket II Kannamwar Nagar Mumbai

by Mumbai Housing And Area Development Board Public Authority
Certificate SignedPM1181012503046
Cons 1221 MIG T/S and 100 Shops S. No. 113 (pt), CTS 356/A (pt) Pocket II Kannamwar Nagar MumbaiProject photos will appear here when available.

Project Information

RERA Certificate No.
PM1181012503046
Registration No.
PM1181012503046
Registration Date
2026-03-25
Developer
Mumbai Housing And Area Development Board Public Authority
Proposed Possession
2033-04-30
Revised Possession
2032-12-31
Total Units
1321
Units Sold
0 (0%)
Buildings
2
Project Area
133173.53 sq.m
MahaRERA QR
Cons 1221 MIG T/S and 100 Shops S. No. 113 (pt), CTS 356/A (pt) Pocket II Kannamwar Nagar Mumbai
MahaRERA โ€” PM1181012503046
Scan to verify on MahaRERA portal

Wing-wise Details

๐Ÿ—๏ธProposed Floors35
โœ…Sanctioned35
๐Ÿ Habitable32
๐Ÿ”ขTotal Units256
๐ŸกResidential240
๐ŸขNon-Residential16
๐Ÿ—๏ธProposed Floors35
โœ…Sanctioned35
๐Ÿ Habitable32
๐Ÿ”ขTotal Units256
๐ŸกResidential240
๐ŸขNon-Residential16
๐Ÿ—๏ธProposed Floors36
โœ…Sanctioned36
๐Ÿ Habitable33
๐Ÿ”ขTotal Units263
๐ŸกResidential247
๐ŸขNon-Residential16
๐Ÿ—๏ธProposed Floors36
โœ…Sanctioned36
๐Ÿ Habitable33
๐Ÿ”ขTotal Units263
๐ŸกResidential247
๐ŸขNon-Residential16
๐Ÿ—๏ธProposed Floors36
โœ…Sanctioned36
๐Ÿ Habitable33
๐Ÿ”ขTotal Units263
๐ŸกResidential247
๐ŸขNon-Residential16
๐Ÿ—๏ธProposed Floors1
โœ…Sanctioned1
๐Ÿ Habitable1
๐Ÿ”ขTotal Units20
๐ŸขNon-Residential20

Construction Progress

Building No 2 - Building 2 Wing A

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.15%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Plinth100%
Podiums (if any)90%
Sanitary Fittings within the flats / premises30%
Slabs of Super Structure90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
Stilt Floor90%

Building No 2 - Building 2 Wing B

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.15%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Plinth100%
Podiums (if any)90%
Sanitary Fittings within the flats / premises30%
Slabs of Super Structure95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
Stilt Floor90%

Building No 3 - Building No 3 Wing A

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.15%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises65%
Plinth100%
Podiums (if any)90%
Sanitary Fittings within the flats / premises25%
Slabs of Super Structure90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
Stilt Floor90%

Building No 3 - Building No 3 Wing B

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.15%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Plinth100%
Podiums (if any)80%
Sanitary Fittings within the flats / premises20%
Slabs of Super Structure80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks65%
Stilt Floor80%

Building No 3 - Building No 3 Wing C

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.15%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises55%
Plinth100%
Podiums (if any)80%
Sanitary Fittings within the flats / premises15%
Slabs of Super Structure80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
Stilt Floor80%

Building No 3 - Wing 3A - Conveyance Shops

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

RERA Registered Amenities

โฌœAggregate area of recreational Open Space
โฌœCommunity Buildings
โœ…Electrical meter room, sub-station, receiving station
โœ…Energy managemcnt
โœ…Fire protection and fire safety requirements
โœ…Internal Roads & Footpaths
โœ…Landscaping & Tree Planting
โœ…Open Parking
โœ…Sewerage (Chamber, Lines, Septic Tank , STP)
โฌœSolid Waste Management And Disposal
โœ…Storm Water Drains
โœ…Street Lighting
โœ…Treatment And Disposal Of Sewage And Sullage Water
โœ…Water Supply
โœ…Water conservation /Rain water harvesting