D
✓ MahaRERA P99000056226RERA: no litigation reported18
Units
2029
Possession
1
Buildings
Certificate Signed
Status
Lifecycle requires verification
Ask an advisor to verify the current project and inventory status.
Source stage: New · mapped resale: 0 · mapped rental: 0 · primary status: not confirmed
01
Possession Timeline
Proposed
Jan 2029
Status
New
02
Unit Configurations (per MahaRERA)
ConfigurationCarpetIndicative Price
1 BHK368–445 ft²On request
2 BHK484–499 ft²On request
Configurations & carpet per MahaRERA filing · indicative price = locality rate × carpet (not the developer's quote).
💬 Verify current inventory with an advisor03
RERA Trust Record
MahaRERA No.
P99000056226
Registered
2024-05-22
Litigation
No reported in source
Escrow Bank
ICICI BANK LIMITED
Architect
Arpita Prakash Bari
Total FSI
887
04
Buildings · 1 Wing(s)
Building Type E5 floors · 18 units
05
Land DNA · Genesis
Redevelopment / SRA / MHADA / MMRDA / Freehold — provenance from MPE's verification layer. The genesis no portal shows.
06
Location
📍 Boisar West
19.8750623,72.76284509999999
19.8750623,72.76284509999999
▸ Explore map & Street View — for verified buyers
07
Promoter & Professionals
BHUSHAN ANANT SHANKHE—
DARSHAN RAJANIKANT SHROFF—
DINESH KAMLAKAR PIMPLE—
FALGUUN SANMUKH SHAH—
09
Construction Progress
99% avgBasement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%
Plinth100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%
Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
10
Amenities
Electrical Meter Room, Sub-Station, Receiving StationSewerage (Chamber, Lines, Septic Tank , STP)Street LightingWater Conservation, Rain water HarvestingWater Supply
12
Talk to our MahaRERA advisor
Tell our MahaRERA advisor what you need and they'll guide you on this project.
💬 Verify current project inventory08
Property Rates in Boisar West
Residential · Sale
₹6,000–10,000/sqft
Commercial · Sale
₹6,000–7,500/sqft
2 BHK · Rent
₹10,000–20,000/mo
Full rates
15
MahaRERA projects nearby in Boisar West
?
Frequently Asked Questions
When is possession of Darshan Swapnalok Phase 2?
As per MahaRERA, proposed possession is Jan 2029.
Is Darshan Swapnalok Phase 2 RERA-registered?
Yes — MahaRERA registration P99000056226, registered 2024-05-22. The current MahaRERA source record reports no litigations.
Who is the developer?
Intelligent Landmarks View their track record ▸
How do I book or get more details?
Tap WhatsApp or Call below to speak with a Mumbai Property Exchange advisor — serving Mumbai since 1995 · RERA-registered since 2017.