Updated Oct 2026
What we know about Proposed Redevelopment of existing Transit Camp at Sion, Construction of 91 EWS T/s. 285 Transit T/s +19 shops, 31 LIG T/s, 56 MIG T/s, on land bearing CS. No. 4(Pt.) salt pan Dn. F/N ward at Sion PH - V, Mumbai, and homes like it in Ward Fnorth with prices — sent to your WhatsApp by an MPE advisor.
Or log in with a one-time code
Mumbai Property Exchange · MahaRERA agent A51800043517 · advising buyers since 1995. Your number is used to respond to your enquiry.
A first look at Proposed Redevelopment of existing Transit Camp at Sion, Construction of 91 EWS T/s. 285 Transit T/s +19 shops, 31 LIG T/s, 56 MIG T/s, on land bearing CS. No. 4(Pt.) salt pan Dn. F/N ward at Sion PH - V, Mumbai
Proposed Redevelopment of existing Transit Camp at Sion, Construction of 91 EWS T/s. 285 Transit T/s +19 shops, 31 LIG T/s, 56 MIG T/s, on land bearing CS. No. 4(Pt.) salt pan Dn. F/N ward at Sion PH - V, Mumbai is a residential project in Ward Fnorth, Mumbai. It is registered with MahaRERA under PR1170002600192 (registered 2026-04-18). The project has 352 units across 4 buildings of up to 23 floors. MahaRERA proposed possession: Apr 2031, revised to Dec 2030.
Ask an advisor to verify the current project and inventory status.
About Proposed Redevelopment of existing Transit Camp at Sion, Construction of 91 EWS T/s. 285 Transit T/s +19 shops, 31 LIG T/s, 56 MIG T/s, on land bearing CS. No. 4(Pt.) salt pan Dn. F/N ward at Sion PH - V, Mumbai
Location
Proposed Redevelopment of existing Transit Camp at Sion, Construction of 91 EWS T/s. 285 Transit T/s +19 shops, 31 LIG T/s, 56 MIG T/s, on land bearing CS. No. 4(Pt.) salt pan Dn. F/N ward at Sion PH - V, Mumbai is located in Ward Fnorth, Mumbai, in the Mumbai City district.
MahaRERA record
The MahaRERA registration number is PR1170002600192, issued on 18 April 2026. The filing lists 4 wings: Building 74 with 88 units over 23 floors; Building 75 Wing B with 88 units over 23 floors; Building 75 Wing-A with 88 units over 23 floors; Building 76 with 88 units over 23 floors.
Construction and possession
The latest MahaRERA progress report shows foundation at 100%, structure at 72%, finishing at 63%, services at 72%. Proposed possession is Apr 2031, revised to Dec 2030.
Upcoming projects & infrastructure in Sion
take an informed decision21 MahaRERA projects are due to hand over in Sion between 2026 and 2030; the nearest upcoming infrastructure to Proposed Redevelopment of existing Transit Camp at Sion, Construction of 91 EWS T/s. 285 Transit T/s +19 shops, 31 LIG T/s, 56 MIG T/s, on land bearing CS. No. 4(Pt.) salt pan Dn. F/N ward at Sion PH - V, Mumbai is the Line 4 Green, 2.3 km away (under construction · due 2027).
- 🚇Line 4 GreenUnder construction · due 20272.3 km
- 🚇Line 2B YellowOpened 20262.7 km
- 🚇Line 3 AquaOpened 20252.7 km
- 🚄Mumbai-Ahmedabad Bullet TrainUnder construction · due 20292.7 km
- 🚇Line 11 GreenApproved2.9 km
Ask on WhatsApp — we answer right in the chat with live asking prices, listings and registered sales for Sion, then an advisor calls about your budget and configuration.
Prices and timelines are indicative and subject to change. See the disclaimer at the foot of this page.
Proposed Redevelopment of existing Transit Camp at Sion, Construction of 91 EWS T/s. 285 Transit T/s +19 shops, 31 LIG T/s, 56 MIG T/s, on land bearing CS. No. 4(Pt.) salt pan Dn. F/N ward at Sion PH - V, Mumbai MahaRERA number and possession date
Proposed Redevelopment of existing Transit Camp at Sion, Construction of 91 EWS T/s. 285 Transit T/s +19 shops, 31 LIG T/s, 56 MIG T/s, on land bearing CS. No. 4(Pt.) salt pan Dn. F/N ward at Sion PH - V, Mumbai towers and phases
4 wings · 352 unitsProposed Redevelopment of existing Transit Camp at Sion, Construction of 91 EWS T/s. 285 Transit T/s +19 shops, 31 LIG T/s, 56 MIG T/s, on land bearing CS. No. 4(Pt.) salt pan Dn. F/N ward at Sion PH - V, Mumbai address and location
Neighbourhood around Proposed Redevelopment of existing Transit Camp at Sion, Construction of 91 EWS T/s. 285 Transit T/s +19 shops, 31 LIG T/s, 56 MIG T/s, on land bearing CS. No. 4(Pt.) salt pan Dn. F/N ward at Sion PH - V, Mumbai
Proposed Redevelopment of existing Transit Camp at Sion, Construction of 91 EWS T/s. 285 Transit T/s +19 shops, 31 LIG T/s, 56 MIG T/s, on land bearing CS. No. 4(Pt.) salt pan Dn. F/N ward at Sion PH - V, Mumbai in Ward Fnorth is 0.6 km from Wadala Depot metro station, 0.7 km from Guru Tegh Bahadur Nagar railway station, 0.8 km from Dharmaprakash Sreenivasaiah High School and 0.8 km from K.J. Somaiya Hospital and Research Centre.
- Ⓜ Metro stationWadala Depot0.6 km
- Ⓜ Metro stationGuru Tegh Bahadur Nagar0.6 km
- 🚉 Railway stationGuru Tegh Bahadur Nagar0.7 km
- 🏫 SchoolDharmaprakash Sreenivasaiah High School0.8 km
- 🏫 SchoolGuru Nanak National High School1.0 km
- 🏥 HospitalK.J. Somaiya Hospital and Research Centre0.8 km
- 🏥 HospitalResham Hospital1.1 km
- 🎓 CollegeSIES College of Commerce & Economics0.3 km
- 🛍 MallJio World Drive2.4 km
- 🌳 ParkMala Garden0.2 km
Straight-line distances from the project; road distance is longer. Places from OpenStreetMap. See them on the map →
Construction progress
per MahaRERASee all 14 stages ▾
Amenities declared to MahaRERA
15+7 more ▾
Next steps — clarity before you step out
Buying a home is not a quick decision. In association with developers, Mumbai Property Exchange sets up the video briefings (Google Meet, Teams or WhatsApp video), the site visits and the paperwork questions — so your homework is done before you commit an afternoon.
MahaRERA projects nearby in Ward Fnorth
Frequently Asked Questions
Where is Proposed Redevelopment of existing Transit Camp at Sion, Construction of 91 EWS T/s. 285 Transit T/s +19 shops, 31 LIG T/s, 56 MIG T/s, on land bearing CS. No. 4(Pt.) salt pan Dn. F/N ward at Sion PH - V, Mumbai located?
Proposed Redevelopment of existing Transit Camp at Sion, Construction of 91 EWS T/s. 285 Transit T/s +19 shops, 31 LIG T/s, 56 MIG T/s, on land bearing CS. No. 4(Pt.) salt pan Dn. F/N ward at Sion PH - V, Mumbai is in Ward Fnorth, Mumbai.
When is possession of Proposed Redevelopment of existing Transit Camp at Sion, Construction of 91 EWS T/s. 285 Transit T/s +19 shops, 31 LIG T/s, 56 MIG T/s, on land bearing CS. No. 4(Pt.) salt pan Dn. F/N ward at Sion PH - V, Mumbai?
As per MahaRERA, proposed possession is Apr 2031, revised to Dec 2030.
Is Proposed Redevelopment of existing Transit Camp at Sion, Construction of 91 EWS T/s. 285 Transit T/s +19 shops, 31 LIG T/s, 56 MIG T/s, on land bearing CS. No. 4(Pt.) salt pan Dn. F/N ward at Sion PH - V, Mumbai RERA-registered?
Yes — MahaRERA registration PR1170002600192, registered 2026-04-18.
How many units does Proposed Redevelopment of existing Transit Camp at Sion, Construction of 91 EWS T/s. 285 Transit T/s +19 shops, 31 LIG T/s, 56 MIG T/s, on land bearing CS. No. 4(Pt.) salt pan Dn. F/N ward at Sion PH - V, Mumbai have?
MahaRERA records 352 units across 4 buildings, up to 23 floors.
Who is the developer of Proposed Redevelopment of existing Transit Camp at Sion, Construction of 91 EWS T/s. 285 Transit T/s +19 shops, 31 LIG T/s, 56 MIG T/s, on land bearing CS. No. 4(Pt.) salt pan Dn. F/N ward at Sion PH - V, Mumbai?
Maharashtra Housing and Area Development Authority View their track record ▸
How many new projects are coming up in Sion?
21 MahaRERA-registered projects in Sion are due for possession between 2026 and 2030, as per MahaRERA registrations. Timelines can change.
What metro and infrastructure is near Proposed Redevelopment of existing Transit Camp at Sion, Construction of 91 EWS T/s. 285 Transit T/s +19 shops, 31 LIG T/s, 56 MIG T/s, on land bearing CS. No. 4(Pt.) salt pan Dn. F/N ward at Sion PH - V, Mumbai?
Line 4 Green — under construction · due 2027, 2.3 km away; Line 2B Yellow — opened 2026, 2.7 km away; Line 3 Aqua — opened 2025, 2.7 km away; Mumbai-Ahmedabad Bullet Train — under construction · due 2029, 2.7 km away. Timelines are as announced and can change.
How do I book or get more details?
Tap WhatsApp or Call below to speak with a Mumbai Property Exchange advisor — serving Mumbai since 1995 · RERA-registered since 2017.
How far is Proposed Redevelopment of existing Transit Camp at Sion, Construction of 91 EWS T/s. 285 Transit T/s +19 shops, 31 LIG T/s, 56 MIG T/s, on land bearing CS. No. 4(Pt.) salt pan Dn. F/N ward at Sion PH - V, Mumbai from the nearest metro and railway station?
Proposed Redevelopment of existing Transit Camp at Sion, Construction of 91 EWS T/s. 285 Transit T/s +19 shops, 31 LIG T/s, 56 MIG T/s, on land bearing CS. No. 4(Pt.) salt pan Dn. F/N ward at Sion PH - V, Mumbai is about 0.6 km from Wadala Depot metro station and 0.7 km from Guru Tegh Bahadur Nagar railway station (straight-line distance; road distance is longer).