R
✓ MahaRERA P51900055203RERA: no litigation reportedRam Setu Bhavan
Gbd Infracon
📍 Matunga Division,Dadar East · 400014
59
Units
2028
Possession
1
Buildings
Certificate Signed
Status
Lifecycle requires verification
Ask an advisor to verify the current project and inventory status.
Source stage: New · mapped resale: 0 · mapped rental: 0 · primary status: not confirmed
01
Possession Timeline
Proposed
Dec 2028
Status
New
02
Unit Configurations (per MahaRERA)
ConfigurationCarpetIndicative Price
Mp309 ft²On request
1 BHK518–592 ft²On request
2.5972 ft²On request
2 BHK671–979 ft²On request
3 BHK1,012–1,221 ft²On request
Shop19–2,120 ft²On request
Configurations & carpet per MahaRERA filing · indicative price = locality rate × carpet (not the developer's quote).
💬 Verify current inventory with an advisor03
RERA Trust Record
MahaRERA No.
P51900055203
Registered
2024-03-11
Litigation
No reported in source
Escrow Bank
BANK OF BARODA
Architect
Concept Infrastructure Consultants
Total FSI
4858
04
Buildings · 1 Wing(s)
Ram Setu Bhavan27 floors · 59 units
05
Land DNA · Genesis
Redevelopment / SRA / MHADA / MMRDA / Freehold — provenance from MPE's verification layer. The genesis no portal shows.
06
Location
📍 Matunga Division,Dadar East
19.0156893,72.8513712
19.0156893,72.8513712
▸ Explore map & Street View — for verified buyers
07
Promoter & Professionals
GBD INFRACON LLPNA
09
Construction Progress
46% avgBasement (if any)100%
Excavation100%
Plinth100%
Podiums (if any) 100%
Slabs of Super Structure75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks18%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises12%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Sanitary Fittings within the flats / premises0%
Stilt Floor 0%
10
Amenities
Aggregate area of recreational Open SpaceElectrical Meter Room, Sub-Station, Receiving StationFire Protection And Fire Safety RequirementsSewerage (Chamber, Lines, Septic Tank , STP)Storm Water DrainsWater Conservation, Rain water HarvestingWater SupplyWater conservation /Rain water harvesting
12
Talk to our MahaRERA advisor
Tell our MahaRERA advisor what you need and they'll guide you on this project.
💬 Verify current project inventory?
Frequently Asked Questions
When is possession of Ram Setu Bhavan?
As per MahaRERA, proposed possession is Dec 2028.
Is Ram Setu Bhavan RERA-registered?
Yes — MahaRERA registration P51900055203, registered 2024-03-11. The current MahaRERA source record reports no litigations.
Who is the developer?
Gbd Infracon
How do I book or get more details?
Tap WhatsApp or Call below to speak with a Mumbai Property Exchange advisor — serving Mumbai since 1995 · RERA-registered since 2017.