Roop Rajat Park Phase 3Project photos will appear here when available.
Project Information
RERA Certificate No.
P99000046640
Registration No.
REA99000112724
Registration Date
2022-08-25
Developer
MAHAVIR ASSOCIATES Partnership
Architect
Pranav Deshmukh
Project Bank
IDBI BANK
Proposed Possession
2027-07-31
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Total Units
420
Units Sold
392 (93%)
Buildings
38
Project Area
34156.00 sq.m
Total FSI
163561.00
Approved FSI
163561.00
Roop Rajat Park Phase 3 MahaRERA — P99000046640
Scan to verify on MahaRERA portal
Wing-wise Details
🏗️Proposed Floors20
✅Sanctioned20
🏠Habitable7
🔢Total
Units14
🏡Residential14
🏗️Proposed Floors20
✅Sanctioned20
🏠Habitable7
🔢Total
Units14
🏡Residential14
🏗️Proposed Floors21
✅Sanctioned21
🏠Habitable7
🔢Total
Units28
🏡Residential28
🏗️Proposed Floors58
✅Sanctioned58
🏠Habitable6
🔢Total
Units38
🏡Residential20
🏢Non-Residential18
🏗️Proposed Floors8
✅Sanctioned8
🏠Habitable6
🔢Total
Units51
🏡Residential18
🏢Non-Residential33
🏗️Proposed Floors8
✅Sanctioned8
🏠Habitable6
🔢Total
Units44
🏡Residential20
🏢Non-Residential24
🏗️Proposed Floors16
✅Sanctioned16
🏠Habitable7
🔢Total
Units14
🏡Residential14
🏗️Proposed Floors16
✅Sanctioned16
🏠Habitable7
🔢Total
Units14
🏡Residential14
🏗️Proposed Floors16
✅Sanctioned16
🏠Habitable7
🔢Total
Units14
🏡Residential14
🏗️Proposed Floors14
✅Sanctioned14
🏠Habitable7
🔢Total
Units14
🏡Residential14
🏗️Proposed Floors10
✅Sanctioned10
🏠Habitable7
🔢Total
Units16
🏡Residential14
🏢Non-Residential2
🏗️Proposed Floors14
✅Sanctioned14
🏠Habitable7
🔢Total
Units34
🏡Residential28
🏢Non-Residential6
🏗️Proposed Floors14
✅Sanctioned14
🏠Habitable7
🔢Total
Units34
🏡Residential28
🏢Non-Residential6
🏗️Proposed Floors14
✅Sanctioned14
🏠Habitable7
🔢Total
Units34
🏡Residential28
🏢Non-Residential6
🏗️Proposed Floors14
✅Sanctioned14
🏠Habitable7
🔢Total
Units34
🏡Residential28
🏢Non-Residential6
🏗️Proposed Floors3
✅Sanctioned3
🏠Habitable2
🔢Total
Units1
🏡Residential1
🏗️Proposed Floors3
✅Sanctioned3
🏠Habitable2
🔢Total
Units1
🏡Residential1
🏗️Proposed Floors3
✅Sanctioned3
🏠Habitable2
🔢Total
Units1
🏡Residential1
🏗️Proposed Floors3
✅Sanctioned3
🏠Habitable2
🔢Total
Units1
🏡Residential1
🏗️Proposed Floors3
✅Sanctioned3
🏠Habitable2
🔢Total
Units1
🏡Residential1
🏗️Proposed Floors3
✅Sanctioned3
🏠Habitable2
🔢Total
Units1
🏡Residential1
🏗️Proposed Floors3
✅Sanctioned3
🏠Habitable2
🔢Total
Units1
🏡Residential1
🏗️Proposed Floors2
✅Sanctioned2
🏠Habitable1
🔢Total
Units1
🏡Residential1
🏗️Proposed Floors2
✅Sanctioned2
🏠Habitable1
🔢Total
Units1
🏡Residential1
🏗️Proposed Floors2
✅Sanctioned2
🏠Habitable1
🔢Total
Units1
🏡Residential1
🏗️Proposed Floors2
✅Sanctioned2
🏠Habitable1
🔢Total
Units1
🏡Residential1
🏗️Proposed Floors2
✅Sanctioned2
🏠Habitable1
🔢Total
Units1
🏡Residential1
🏗️Proposed Floors2
✅Sanctioned2
🏠Habitable1
🔢Total
Units1
🏡Residential1
🏗️Proposed Floors2
✅Sanctioned2
🏠Habitable1
🔢Total
Units1
🏡Residential1
🏗️Proposed Floors2
✅Sanctioned2
🏠Habitable1
🔢Total
Units1
🏡Residential1
🏗️Proposed Floors2
✅Sanctioned2
🏠Habitable1
🔢Total
Units1
🏡Residential1
🏗️Proposed Floors2
✅Sanctioned2
🏠Habitable1
🔢Total
Units1
🏡Residential1
🏗️Proposed Floors2
✅Sanctioned2
🏠Habitable1
🔢Total
Units1
🏡Residential1
🏗️Proposed Floors2
✅Sanctioned2
🏠Habitable1
🔢Total
Units1
🏡Residential1
🏗️Proposed Floors2
✅Sanctioned2
🏠Habitable1
🔢Total
Units1
🏡Residential1
🏗️Proposed Floors2
✅Sanctioned2
🏠Habitable1
🔢Total
Units1
🏡Residential1
🏗️Proposed Floors2
✅Sanctioned2
🏠Habitable1
🔢Total
Units1
🏡Residential1
🏗️Proposed Floors2
✅Sanctioned2
🏠Habitable1
🔢Total
Units1
🏡Residential1
Apartment Configurations
Roop Rajat Park Sector 1 Bld 11
Type
Carpet (sq.ft)
Total
Booked
Available
Status
4BHK
136.6
14
12
2
86%
Roop Rajat Park Sector 1 Bld 12
Type
Carpet (sq.ft)
Total
Booked
Available
Status
4BHK
121.77
14
9
5
64%
Roop Rajat Park Sector 1 Bld 16
Type
Carpet (sq.ft)
Total
Booked
Available
Status
3BHK
89.88
28
28
0
100%
Roop Rajat Park Sector 1 Bld 2 A
Type
Carpet (sq.ft)
Total
Booked
Available
Status
2BHK
64.13
18
13
5
72%
2BHK
65.74
1
1
0
100%
2BHK
67.73
1
1
0
100%
Shop
29.13
8
5
3
62%
Shop
32.23
4
2
2
50%
Shop
35.6
4
4
0
100%
Shop
39.39
2
2
0
100%
Roop Rajat Park Sector 1 Bld 2 B
Type
Carpet (sq.ft)
Total
Booked
Available
Status
2BHK
64.13
15
8
7
53%
2BHK
65.97
1
1
0
100%
2BHK
67.11
1
0
1
0%
2BHK
67.73
1
0
1
0%
Shop
25.49
2
0
2
0%
Shop
27.57
2
1
1
50%
Shop
29.13
6
3
3
50%
Shop
32.23
6
0
6
0%
Shop
33.56
2
1
1
50%
Shop
33.7
1
1
0
100%
Shop
33.78
2
1
1
50%
Shop
34.95
1
1
0
100%
Shop
35.6
3
3
0
100%
Shop
39.39
3
3
0
100%
Shop
41.02
1
0
1
0%
Shop
41.29
1
1
0
100%
Shop
42.1
2
0
2
0%
Shop
73.53
1
0
1
0%
Roop Rajat Park Sector 1 Bld 2 C
Type
Carpet (sq.ft)
Total
Booked
Available
Status
2BHK
64.13
18
14
4
78%
2BHK
65.71
1
1
0
100%
2BHK
67.73
1
1
0
100%
Shop
29.13
8
0
8
0%
Shop
32.23
4
0
4
0%
Shop
32.47
2
1
1
50%
Shop
33.57
2
0
2
0%
Shop
35.6
4
1
3
25%
Shop
39.39
2
2
0
100%
Shop
39.68
1
1
0
100%
Shop
41.02
1
1
0
100%
Roop Rajat Park Sector 1 Bld 5 A
Type
Carpet (sq.ft)
Total
Booked
Available
Status
3BHK
101.57
14
10
4
71%
Roop Rajat Park Sector 1 Bld 5 B
Type
Carpet (sq.ft)
Total
Booked
Available
Status
3BHK
101.57
14
11
3
79%
Roop Rajat Park Sector 1 Bld 5 C
Type
Carpet (sq.ft)
Total
Booked
Available
Status
3BHK
101.57
14
12
2
86%
Roop Rajat Park Sector 3 Bld 6A
Type
Carpet (sq.ft)
Total
Booked
Available
Status
2BHK
59.52
14
14
0
100%
Roop Rajat Park Sector 3 Bld 6B
Type
Carpet (sq.ft)
Total
Booked
Available
Status
2BHK
59.52
13
12
1
92%
2BHK
60.31
1
1
0
100%
Shop
26.73
1
1
0
100%
Shop
35.29
1
1
0
100%
Roop Rajat Park Sector 3 Bld 7A
Type
Carpet (sq.ft)
Total
Booked
Available
Status
2BHK
58.69
28
28
0
100%
Shop
18.22
2
2
0
100%
Shop
18.83
2
2
0
100%
Shop
25.07
2
2
0
100%
Roop Rajat Park Sector 3 Bld 7B
Type
Carpet (sq.ft)
Total
Booked
Available
Status
2BHK
58.69
28
26
2
93%
Shop
18.22
2
2
0
100%
Shop
18.83
2
2
0
100%
Shop
25.07
2
2
0
100%
Roop Rajat Park Sector 3 Bld 8A
Type
Carpet (sq.ft)
Total
Booked
Available
Status
2BHK
58.69
28
26
2
93%
Shop
18.22
2
2
0
100%
Shop
18.83
2
0
2
0%
Shop
25.07
2
2
0
100%
Roop Rajat Park Sector 3 Bld 8B
Type
Carpet (sq.ft)
Total
Booked
Available
Status
2BHK
58.69
28
24
4
86%
Shop
18.22
2
1
1
50%
Shop
18.83
2
1
1
50%
Shop
25.07
2
2
0
100%
Roop Rajat Park Sector 4 Bunglow G1
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Bungalow
258.38
1
0
1
0%
Roop Rajat Park Sector 4 Bunglow G2
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Bungalow
258.38
1
0
1
0%
Roop Rajat Park Sector 4 Bunglow G3
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Bungalow
258.38
1
0
1
0%
Roop Rajat Park Sector 4 Bunglow G4
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Bungalow
258.38
1
0
1
0%
Roop Rajat Park Sector 4 Bunglow G5
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Bungalow
258.38
1
0
1
0%
Roop Rajat Park Sector 4 Bunglow G6
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Bungalow
258.38
1
1
0
100%
Roop Rajat Park Sector 4 Bunglow G7
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Bungalow
258.38
1
1
0
100%
Roop Rajat Park Sector 4 RH A3
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Bungalow
184.17
1
1
0
100%
Roop Rajat Park Sector 4 RH A4
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Bungalow
184.17
1
1
0
100%
Roop Rajat Park Sector 4 RH A5
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Bungalow
184.17
1
0
1
0%
Roop Rajat Park Sector 4 RH A6
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Bungalow
184.17
1
0
1
0%
Roop Rajat Park Sector 4 RH A7
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Bungalow
184.17
1
0
1
0%
Roop Rajat Park Sector 4 RH B1
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Bungalow
125.87
1
0
1
0%
Roop Rajat Park Sector 4 RH B10
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Bungalow
125.87
1
1
0
100%
Roop Rajat Park Sector 4 RH B11
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Bungalow
125.87
1
1
0
100%
Roop Rajat Park Sector 4 RH B2
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Bungalow
125.87
1
1
0
100%
Roop Rajat Park Sector 4 RH B3
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Bungalow
125.87
1
1
0
100%
Roop Rajat Park Sector 4 RH B4
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Bungalow
125.87
1
1
0
100%
Roop Rajat Park Sector 4 RH B5
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Bungalow
125.87
1
1
0
100%
Roop Rajat Park Sector 4 RH B6
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Bungalow
125.87
1
0
1
0%
Roop Rajat Park Sector 4 RH B7
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Bungalow
125.87
2
1
1
50%
Roop Rajat Park Sector 4 RH B8
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Bungalow
125.87
1
1
0
100%
Roop Rajat Park Sector 4 RH B9
Type
Carpet (sq.ft)
Total
Booked
Available
Status
Bungalow
125.87
1
1
0
100%
Construction Progress
NA Plot Without Structure
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
Roop Rajat Park Sector 1 Bld 11
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises40%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
Roop Rajat Park Sector 1 Bld 12
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises25%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
Roop Rajat Park Sector 1 Bld 16
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
Roop Rajat Park Sector 1 Bld 2 A
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
Roop Rajat Park Sector 1 Bld 2 B
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
Roop Rajat Park Sector 1 Bld 2 C
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
Roop Rajat Park Sector 1 Bld 5 A
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises50%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
Roop Rajat Park Sector 1 Bld 5 B
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises50%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
Roop Rajat Park Sector 1 Bld 5 C
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises50%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
Roop Rajat Park Sector 3 Bld 6A
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
Roop Rajat Park Sector 3 Bld 6B
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
Roop Rajat Park Sector 3 Bld 7A
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
Roop Rajat Park Sector 3 Bld 7B
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
Roop Rajat Park Sector 3 Bld 8A
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
Roop Rajat Park Sector 3 Bld 8B
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
Roop Rajat Park Sector 4 Bunglow G1
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor0%
Roop Rajat Park Sector 4 Bunglow G2
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor0%
Roop Rajat Park Sector 4 Bunglow G3
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor0%
Roop Rajat Park Sector 4 Bunglow G4
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor0%
Roop Rajat Park Sector 4 Bunglow G5
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor0%
Roop Rajat Park Sector 4 Bunglow G6
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor0%
Roop Rajat Park Sector 4 Bunglow G7
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor0%
Roop Rajat Park Sector 4 RH A3
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
Roop Rajat Park Sector 4 RH A4
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
Roop Rajat Park Sector 4 RH A5
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
Roop Rajat Park Sector 4 RH A6
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
Roop Rajat Park Sector 4 RH A7
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
Roop Rajat Park Sector 4 RH B1
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
Roop Rajat Park Sector 4 RH B10
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
Roop Rajat Park Sector 4 RH B11
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
Roop Rajat Park Sector 4 RH B2
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
Roop Rajat Park Sector 4 RH B3
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
Roop Rajat Park Sector 4 RH B4
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor0%
Roop Rajat Park Sector 4 RH B5
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
Roop Rajat Park Sector 4 RH B6
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
Roop Rajat Park Sector 4 RH B7
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
Roop Rajat Park Sector 4 RH B8
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
Roop Rajat Park Sector 4 RH B9
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
RERA Registered Amenities
⬜Aggregate area of recreational Open Space
⬜Community Buildings
✅Electrical meter room, sub-station, receiving station
⬜Energy managemcnt
✅Fire protection and fire safety requirements100%
✅Internal Roads & Footpaths70%
✅Landscaping & Tree Planting50%
⬜Open Parking
✅Sewerage (Chamber, Lines, Septic Tank , STP)50%
⬜Solid Waste Management And Disposal
✅Storm Water Drains50%
✅Street Lighting100%
✅Treatment And Disposal Of Sewage And Sullage Water100%