RUNWAL PEARL

by Runwal Construction Private Limited Company
Certificate Signed P51700001383
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700001383
Registration No.
REA51700005544
Registration Date
2017-07-27
Developer
Runwal Construction Private Limited Company
Architect
Pallavi Matkari
Project Bank
HDFC BANK
Proposed Possession
2019-05-31
Revised Possession
2019-05-31
Extended Possession
2024-12-31
Units Sold
0
Buildings
2
Project Area
6020.62 sq.m
Total FSI
16707.86
Approved FSI
16102.23
MahaRERA QR
RUNWAL PEARL
MahaRERA — P51700001383
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors32
Sanctioned32
🚗Open Parking75
🅿️Closed Parking1
📅Completion2019-05-31
🏗️Proposed Floors27
Sanctioned27
🚗Open Parking110
🅿️Closed Parking1
📅Completion2019-05-31

Apartment Configurations

Tower A - Doris

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 60.58 32 31 1
97%
2 BHK 60.82 9 8 1
89%
2 BHK 63.49 14 14 0
100%
3 BHK 68.65 43 39 4
91%
3 BHK 73.74 17 17 0
100%

Tower E - Rissoina

Type Carpet (sq.ft) Total Booked Available Status
1 BHK 33.88 5 5 0
100%
1 BHK 39.7 2 2 0
100%
1 BHK 40.92 4 4 0
100%
2 BHK 54.31 15 15 0
100%
2 BHK 54.96 16 16 0
100%
2 BHK 55.93 9 9 0
100%
2 BHK 56.86 10 10 0
100%
2 BHK 58.03 10 10 0
100%
2 BHK 58.79 9 9 0
100%
2 BHK 59.31 10 10 0
100%
2 BHK 60.8 15 15 0
100%
3 BHK 66.0 11 11 0
100%
3 BHK 69.34 30 30 0
100%

Construction Progress

TOWER A - DORIS

Basement (if any)100%

Tower A - Doris

Excavation100%

TOWER A - DORIS

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Tower A - Doris

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

TOWER A - DORIS

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Tower A - Doris

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing90%

TOWER A - DORIS

Plinth100%
Podiums (if any) 0%

Tower A - Doris

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

TOWER A - DORIS

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Tower A - Doris

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

TOWER A - DORIS

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Tower A - Doris

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

TOWER E - RISSOINA

Basement (if any)100%

Tower E - Rissoina

Excavation100%

TOWER E - RISSOINA

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%

Tower E - Rissoina

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate100%

TOWER E - RISSOINA

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%

Tower E - Rissoina

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises100%
Overall Percentage of Completion of the work done For the entire Building /Wing100%

TOWER E - RISSOINA

Plinth100%
Podiums (if any) 100%

Tower E - Rissoina

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises100%

TOWER E - RISSOINA

Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%

Tower E - Rissoina

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.100%

TOWER E - RISSOINA

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%

Tower E - Rissoina

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing100%
X number of Basement(s) and Plinth100%
X number of Podiums100%
X number of Slabs of Super Structure100%

RERA Registered Amenities

Aggregate area of recreational Open Space 100%
Community Buildings 100%
Electrical Meter Room, Sub-Station, Receiving Station 100%
Energy management 100%
Fire Protection And Fire Safety Requirements 100%
Landscaping & Tree Planting 100%
Open Parking 100%
Sewerage (Chamber, Lines, Septic Tank , STP) 100%
Solid Waste Management And Disposal 100%
Storm Water Drains 100%
Street Lighting 100%
Treatment And Disposal Of Sewage And Sullage Water 100%
Water Conservation, Rain water Harvesting 100%
Water Supply 100%
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.