📞 +91 98200 30685 ✉️
RERA: A51800043517

Sagar Sarita Co-operative Housing Society LTD

by Shree Shakti Relcon LLP Partnership
Certificate Signed P51800055739
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51800055739
Registration No.
REA51800156758
Registration Date
2024-04-16
Developer
Shree Shakti Relcon LLP Partnership
Project Bank
AU SMALL FINANCE BANK LIMITED
Proposed Possession
2028-12-31
Units Sold
0
Project Area
3103.20 sq.m
Total FSI
6917.33
Approved FSI
5582.31
MahaRERA QR
Sagar Sarita Co-operative Housing Society LTD
MahaRERA — P51800055739
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors22
Sanctioned22
🅿️Closed Parking63
📅Completion2028-12-31
🏗️Proposed Floors22
Sanctioned22
🅿️Closed Parking63
📅Completion2028-12-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
2Bhk 58.130001068115234 0 0 0
0%
2Bhk 58.290000915527344 0 0 0
0%
2Bhk 58.380001068115234 0 0 0
0%
2Bhk 58.439998626708984 0 0 0
0%
2Bhk 60.689998626708984 0 0 0
0%
2Bhk 64.61000061035156 0 0 0
0%
2Bhk 64.66999816894531 0 0 0
0%
2Bhk 67.79000091552734 0 0 0
0%
2Bhk 68.05000305175781 0 0 0
0%
2Bhk 68.19999694824219 0 0 0
0%
2Bhk 68.2300033569336 0 0 0
0%
2Bhk 68.37999725341797 0 0 0
0%
2Bhk 72.81999969482422 0 0 0
0%
3Bhk 80.87000274658203 0 0 0
0%
3Bhk 85.5199966430664 0 0 0
0%
3Bhk 85.66999816894531 0 0 0
0%
3Bhk 94.23999786376953 0 0 0
0%
3Bhk 95.37000274658203 0 0 0
0%
3Bhk 95.5199966430664 0 0 0
0%
3Bhk 95.54000091552734 0 0 0
0%
3Bhk 112.75 0 0 0
0%
3Bhk 112.79000091552734 0 0 0
0%

A Wing

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 58.13 2 1 1
50%
2 BHK 58.38 2 0 2
0%
2 BHK 64.61 1 0 1
0%
2 BHK 67.79 5 5 0
100%
2 BHK 68.2 4 4 0
100%
2 BHK 68.23 3 3 0
100%
3 BHK 85.52 4 1 3
25%
3 BHK 95.37 5 5 0
100%
3 BHK 112.75 1 1 0
100%

B Wing

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 58.29 1 1 0
100%
2 BHK 58.44 2 0 2
0%
2 BHK 60.69 1 0 1
0%
2 BHK 64.67 1 0 1
0%
2 BHK 68.05 3 3 0
100%
2 BHK 68.38 8 8 0
100%
2 BHK 72.82 1 1 0
100%
3 BHK 80.87 1 1 0
100%
3 BHK 85.67 5 0 5
0%
3 BHK 94.24 1 0 1
0%
3 BHK 95.52 1 1 0
100%
3 BHK 95.54 4 4 0
100%
3 BHK 112.79 1 1 0
100%

Construction Progress

A Wing

Basement (if any)85%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate15%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.15%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Plinth85%
Podiums (if any) 50%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure15%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
Stilt Floor70%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth85%
X number of Podiums50%
X number of Slabs of Super Structure15%

B Wing

Basement (if any)85%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate15%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.15%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Plinth85%
Podiums (if any) 50%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure15%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
Stilt Floor70%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth85%
X number of Podiums50%
X number of Slabs of Super Structure15%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements 20%
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP) 50%
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.