✓ MahaRERA P51700034735RERA: no litigation reported43
Units
2027
Possession
1
Buildings
Certificate Signed
Status
Lifecycle requires verification
Ask an advisor to verify the current project and inventory status.
Source stage: New · mapped resale: 0 · mapped rental: 0 · primary status: not confirmed
01
Possession Timeline
Proposed
Mar 2027
Status
New
02
Unit Configurations (per MahaRERA)
ConfigurationCarpetIndicative Price
Shop121–170 ft²On request
1 RK235–248 ft²On request
1 BHK285–347 ft²On request
Configurations & carpet per MahaRERA filing · indicative price = locality rate × carpet (not the developer's quote).
💬 Verify current inventory with an advisor03
RERA Trust Record
MahaRERA No.
P51700034735
Registered
2022-04-20
Litigation
No reported in source
Escrow Bank
IDBI BANK
Architect
Arc Designers
Total FSI
1387
04
Buildings · 1 Wing(s)
Shilpa Resedency7 floors · — units
05
Land DNA · Genesis
Redevelopment / SRA / MHADA / MMRDA / Freehold — provenance from MPE's verification layer. The genesis no portal shows.
06
Location
📍 Badlpaur
▸ Explore map & Street View — for verified buyers
07
Promoter & Professionals
SHREENATH DEVELOPERSNA
09
Construction Progress
100% avgBasement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any) 100%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor 100%
10
Amenities
Open ParkingSewerage (Chamber, Lines, Septic Tank , STP)Water Conservation, Rain water HarvestingWater SupplyWater conservation /Rain water harvesting
12
Talk to our MahaRERA advisor
Tell our MahaRERA advisor what you need and they'll guide you on this project.
💬 Verify current project inventory14
More by Shreenath Developers
15
MahaRERA projects nearby in Badlpaur
?
Frequently Asked Questions
When is possession of Shilpa Resedency?
As per MahaRERA, proposed possession is Mar 2027.
Is Shilpa Resedency RERA-registered?
Yes — MahaRERA registration P51700034735, registered 2022-04-20. The current MahaRERA source record reports no litigations.
Who is the developer?
Shreenath Developers — 8 projects tracked on Mumbai Property Exchange. View their track record ▸
How do I book or get more details?
Tap WhatsApp or Call below to speak with a Mumbai Property Exchange advisor — serving Mumbai since 1995 · RERA-registered since 2017.