Shiv-Vista Homes

by Prakash Bhimrao Baviskar
Certificate SignedP51700080407
Shiv-Vista HomesProject photos will appear here when available.

Project Information

RERA Certificate No.
P51700080407
Registration No.
REA51700168648
Registration Date
2025-06-02
Developer
Prakash Bhimrao Baviskar
Architect
Ketan Patil
Project Bank
INDUSIND BANK
Proposed Possession
2030-04-30
Total Units
165
Units Sold
1 (1%)
Buildings
4
Project Area
6200.00 sq.m
Total FSI
13386.99
Approved FSI
13386.99
MahaRERA QR
Shiv-Vista Homes
MahaRERA — P51700080407
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors14
✅Sanctioned14
🏠Habitable12
🔢Total Units132
🏡Residential132
🏗️Proposed Floors9
✅Sanctioned9
🏠Habitable7
🔢Total Units28
🏡Residential28
🏗️Proposed Floors3
✅Sanctioned3
🏠Habitable1
🔢Total Units4
🏡Residential4
🏗️Proposed Floors4
✅Sanctioned4
🏠Habitable4
🔢Total Units1
🏢Non-Residential1

Apartment Configurations

Building No 1 wing A B C

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK37.7612012
0%
1BHK37.8712012
0%
1BHK39.7112012
0%
1BHK42.3112012
0%
1BHK42.3212012
0%
1BHK42.5424024
0%
2BHK73.8712012
0%
2BHK74.1512012
0%
2BHK74.7212012
0%
2BHK75.6912012
0%

Building No 2

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK32.36707
0%
1BHK34.8914014
0%
2BHK50.52707
0%

Building No 3

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK31.46404
0%

Hospital Building

TypeCarpet (sq.ft)TotalBookedAvailableStatus
Hospital726.4101
0%

Construction Progress

Building No 1 wing A B C

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises1%
Plinth66%
Podiums (if any)0%
Sanitary Fittings within the flats / premises1%
Slabs of Super Structure11%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks11%
Stilt Floor36%

Building No 2

Basement (if any)0%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth60%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

Building No 3

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

Hospital Building

Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%

RERA Registered Amenities

✅Aggregate area of recreational Open Space
⬜Community Buildings
✅Electrical meter room, sub-station, receiving station
⬜Energy managemcnt
✅Fire protection and fire safety requirements
✅Internal Roads & Footpaths
✅Landscaping & Tree Planting
✅Open Parking
✅Sewerage (Chamber, Lines, Septic Tank , STP)
✅Solid Waste Management And Disposal
✅Storm Water Drains
✅Street Lighting
✅Treatment And Disposal Of Sewage And Sullage Water
✅Water Supply
✅Water conservation /Rain water harvesting