Shreepati Castle

by Shreepati Castle Others
Certificate SignedP51900002235
Shreepati CastleProject photos will appear here when available.

Project Information

RERA Certificate No.
P51900002235
Registration No.
REA51900006595
Registration Date
2021-09-09
Developer
Shreepati Castle Others
Architect
Ld Shah
Project Bank
UNION BANK OF INDIA
Proposed Possession
2024-12-30
Revised Possession
2024-12-30
Extended Possession
1900-01-01
Total Units
577
Units Sold
116 (20%)
Buildings
5
Project Area
5622.55 sq.m
Total FSI
62136.30
Approved FSI
29183.33
MahaRERA QR
Shreepati Castle
MahaRERA โ€” P51900002235
Scan to verify on MahaRERA portal

Wing-wise Details

๐Ÿ—๏ธProposed Floors16
โœ…Sanctioned16
๐Ÿ Habitable16
๐Ÿ”ขTotal Units24
๐ŸขNon-Residential24
๐Ÿ—๏ธProposed Floors43
โœ…Sanctioned43
๐Ÿ Habitable43
๐Ÿ”ขTotal Units155
๐ŸกResidential145
๐ŸขNon-Residential10
๐Ÿ—๏ธProposed Floors18
โœ…Sanctioned18
๐Ÿ Habitable18
๐Ÿ”ขTotal Units240
๐ŸกResidential228
๐ŸขNon-Residential12
๐Ÿ—๏ธProposed Floors8
โœ…Sanctioned8
๐Ÿ Habitable8
๐Ÿ”ขTotal Units35
๐ŸกResidential18
๐ŸขNon-Residential17
๐Ÿ—๏ธProposed Floors23
โœ…Sanctioned23
๐Ÿ Habitable23
๐Ÿ”ขTotal Units123
๐ŸกResidential111
๐ŸขNon-Residential12

Apartment Configurations

Building 2

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK25.57110
100%
1 BHK26.78440
100%
1 BHK28.07110
100%
1 BHK28.93330
100%
1 BHK30.15110
100%
1 BHK31.65110
100%
1 BHK40.19110
100%
1 BHK40.97110
100%
1 BHK41.14110
100%
1 BHK41.55110
100%
1RK21.27110
100%
2 BHK44.03110
100%
2 BHK45.69110
100%
2 BHK47.77110
100%
2.5 BHK55.92110
100%
SHOP 121.12110
100%
SHOP 219.99110
100%
SHOP 315.72110
100%
SHOP 420.58110
100%

Wing A

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK57.73110
100%
2 BHK58.017170
100%
2 BHK58.09303
0%
2 BHK59.18550
100%
2 BHK59.4817170
100%
2 BHK59.817170
100%
2 BHK60.17312
33%
2 BHK62.0330
100%
2 BHK62.25440
100%
2 BHK64.57330
100%
2 BHK75.21660
100%
3 BHK57.86312
33%
3 BHK86.04110
100%
3 BHK86.47303
0%
3 BHK87.1417170
100%
3 BHK88.08624
33%
3 BHK88.64330
100%
3 BHK90.9742420
100%
3 BHK92.63440
100%
3 BHK93.99220
100%
4 BHK129.48660
100%

Wing B,C

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK29.94110
100%
1 BHK33.5330
100%
1 BHK34.38110
100%
1 BHK34.54330
100%
1 BHK34.6110
100%
1 BHK41.53110
100%
1.5 BHK32.66110
100%
1.5 BHK33.7220
100%
1.5 BHK33.76110
100%
1RK19.64110
100%
1RK21.1487870
100%
1RK21.483830
100%
1RK22.03110
100%
1RK22.63110
100%
1RK25.63770
100%
2 BHK42.28770
100%
2 BHK47.21110
100%
2.5 BHK50.01110
100%
SHOP 112.17110
100%
SHOP 1048.39110
100%
SHOP 1112.32110
100%
SHOP 1212.08110
100%
SHOP 1321.42110
100%
SHOP 1411.15110
100%
SHOP 1514.85110
100%
SHOP 1614.44110
100%
SHOP 1798.62110
100%
SHOP 1821.98110
100%
SHOP 1937.44110
100%
SHOP 223.53110
100%
SHOP 2035.16110
100%
SHOP 2115.79110
100%
SHOP 2215.24110
100%
SHOP 2321.86110
100%
SHOP 2416.61110
100%
SHOP 2520.85110
100%
SHOP 2628.72110
100%
SHOP 2728.63110
100%
SHOP 2822.25110
100%
SHOP 2916.23110
100%
SHOP 319.15110
100%
SHOP 4111.15110
100%
SHOP 514.35110
100%
SHOP 622.26110
100%
SHOP 732.22110
100%
SHOP 810.27110
100%
SHOP 916.19110
100%

Wing D

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK73.41110
100%
1.5 BHK64.66110
100%
1.5 BHK83.0110
100%
2 BHK60.13110
100%
2 BHK63.22110
100%
2 BHK66.25110
100%
2 BHK70.97110
100%
2 BHK77.2110
100%
2 BHK82.39110
100%
2.5 BHK83.54110
100%
2.5 BHK96.8110
100%
3 BHK70.38110
100%
3 BHK109.33110
100%
3 BHK117.47110
100%
3 BHK118.0110
100%
3 BHK119.66110
100%
3 BHK120.0110
100%
3 BHK122.48110
100%
SHOP 143.32220
100%
SHOP 1013.81110
100%
SHOP 1124.52110
100%
SHOP 1229.49110
100%
SHOP 1335.7110
100%
SHOP 1436.41110
100%
SHOP 1536.09110
100%
SHOP 220.8110
100%
SHOP 332.02110
100%
SHOP 423.2110
100%
SHOP 524.52110
100%
SHOP 626.5110
100%
SHOP 740.92110
100%
SHOP 839.16110
100%
SHOP 953.11110
100%

Wing D1

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK33.86220
100%
1 BHK36.94110
100%
1 BHK40.24110
100%
1 BHK40.35110
100%
1 BHK42.37550
100%
1 BHK43.011110
100%
1 BHK44.66110
100%
2 BHK33.97880
100%
2 BHK34.17220
100%
2 BHK35.3258580
100%
2 BHK36.62440
100%
2 BHK37.84550
100%
2 BHK38.14110
100%
2 BHK38.43440
100%
2 BHK39.53330
100%
2 BHK47.28110
100%
3 BHK67.04110
100%
SHOP 116.91110
100%
SHOP 1035.61110
100%
SHOP 1137.76110
100%
SHOP 1219.96110
100%
SHOP 227.27110
100%
SHOP 332.07110
100%
SHOP 415.6110
100%
SHOP 547.49110
100%
SHOP 616.65110
100%
SHOP 76.9110
100%
SHOP 817.35110
100%
SHOP 927.03110
100%

Construction Progress

BUILDING 2

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor0%

WING A

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.60%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)100%
Sanitary Fittings within the flats / premises90%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor0%

WING B,C

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor0%

WING D

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor0%

WING D1

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor0%

RERA Registered Amenities

โฌœAggregate area of recreational Open Space
โฌœCommunity Buildings
โœ…Electrical meter room, sub-station, receiving station90%
โœ…Energy managemcnt
โœ…Fire protection and fire safety requirements100%
โœ…Internal Roads & Footpaths
โœ…Landscaping & Tree Planting70%
โฌœOpen Parking
โœ…Sewerage (Chamber, Lines, Septic Tank , STP)80%
โœ…Solid Waste Management And Disposal60%
โœ…Storm Water Drains100%
โœ…Street Lighting100%
โœ…Treatment And Disposal Of Sewage And Sullage Water60%
โœ…Water Supply100%
โœ…Water conservation /Rain water harvesting90%