📞 +91 98200 30685 ✉️
RERA: A51800043517

Tower E to I on CTS no 104pt, 106pt, 224/1A, 224/1B in Village Ghodbunder, Mira Road

by RNA Corp Pvt. Ltd Company
Certificate Signed P51700004482
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700004482
Registration No.
REA51700017345
Registration Date
2017-08-09
Developer
RNA Corp Pvt. Ltd Company
Architect
Anish & Associates
Project Bank
AXIS BANK
Proposed Possession
2019-07-31
Revised Possession
2019-07-31
Extended Possession
1900-01-01
Units Sold
0
Buildings
3
Project Area
11994.92 sq.m
Total FSI
24000.00
Approved FSI
17664.78
MahaRERA QR
Tower E to I on CTS no 104pt, 106pt, 224/1A, 224/1B in Village Ghodbunder, Mira Road
MahaRERA — P51700004482
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors25
Sanctioned25
🚗Open Parking12
🅿️Closed Parking83
📅Completion2019-07-31
🏗️Proposed Floors25
Sanctioned25
🚗Open Parking12
🅿️Closed Parking80
📅Completion1900-01-01
🏗️Proposed Floors25
Sanctioned25
🚗Open Parking6
🅿️Closed Parking40
📅Completion2019-07-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
2 Rhk Type 10 56.939998626708984 0 0 0
0%
2 Rhk Type 12 56.599998474121094 0 0 0
0%
2 Rhk Type 4 45.18000030517578 0 0 0
0%
2 Rhk Type 6 47.470001220703125 0 0 0
0%
2 Rhk Type 7 44.70000076293945 0 0 0
0%
2 Rhk Type 8 56.939998626708984 0 0 0
0%
2Rhk Type 10 56.939998626708984 0 0 0
0%
2Rhk Type 12 56.599998474121094 0 0 0
0%
2Rhk Type 3 44.84000015258789 0 0 0
0%
2Rhk Type 4 45.18000030517578 0 0 0
0%
2Rhk Type 5 47.13999938964844 0 0 0
0%
2Rhk Type 6 47.470001220703125 0 0 0
0%
2Rhk Type 7 44.70000076293945 0 0 0
0%
2Rhk Type 8 56.939998626708984 0 0 0
0%
2Rhk Type 9 58.560001373291016 0 0 0
0%
3 Rhk Type 11 56.599998474121094 0 0 0
0%
3 Rhk Type 2 56.939998626708984 0 0 0
0%
3Rhk Type 1 56.619998931884766 0 0 0
0%
3Rhk Type 11 56.599998474121094 0 0 0
0%
3Rhk Type 2 56.939998626708984 0 0 0
0%
Godown No. 1 17.899999618530273 0 0 0
0%
Godown No. 2 16.31999969482422 0 0 0
0%
Godown No. 3 23.43000030517578 0 0 0
0%
Godown No. 4 17.110000610351562 0 0 0
0%
Godown No. 6 17.899999618530273 0 0 0
0%
Godown No.5 16.31999969482422 0 0 0
0%
Shop Type 1 16.0 0 0 0
0%
Shop Type 2 16.920000076293945 0 0 0
0%
Shop Type 3 16.31999969482422 0 0 0
0%
Shop Type 4 17.110000610351562 0 0 0
0%
Shop Type 5 23.549999237060547 0 0 0
0%
Shop Type 6 16.399999618530273 0 0 0
0%
Shop Type 7 18.010000228881836 0 0 0
0%
Shop Type 8 22.709999084472656 0 0 0
0%

Rna Viva Tower E And F

Type Carpet (sq.ft) Total Booked Available Status
2RHK TYPE 12 56.6 4 2 2
50%
2RHK TYPE 3 44.84 4 2 2
50%
2RHK TYPE 4 45.18 38 37 1
97%
2RHK TYPE 5 47.14 4 1 3
25%
2RHK TYPE 6 47.47 38 37 1
97%
2RHK TYPE 7 44.7 34 30 4
88%
2RHK TYPE 8 56.94 24 0 24
0%
2RHK TYPE 9 58.56 8 0 8
0%
3RHK TYPE 1 56.62 4 2 2
50%
3RHK TYPE 11 56.6 4 0 4
0%
3RHK TYPE 2 56.94 4 4 0
100%
Godown No. 1 17.9 1 0 1
0%
Godown No. 2 16.32 1 0 1
0%
Godown No. 3 23.43 1 0 1
0%
Godown No. 4 17.11 1 0 1
0%
Godown No. 6 17.9 1 0 1
0%
Godown No.5 16.32 1 0 1
0%
SHOP TYPE 1 16.0 1 0 1
0%
SHOP TYPE 2 16.92 1 0 1
0%
SHOP TYPE 3 16.32 1 0 1
0%
SHOP TYPE 4 17.11 1 0 1
0%
SHOP TYPE 5 23.55 1 0 1
0%
SHOP TYPE 6 16.4 1 0 1
0%
SHOP TYPE 7 18.01 1 0 1
0%
Shop Type 8 22.71 1 0 1
0%

Rna Viva Tower G And H

Type Carpet (sq.ft) Total Booked Available Status
2 RHK Type 10 56.94 8 0 8
0%
2 RHK Type 12 56.6 8 0 8
0%
2 RHK Type 4 45.18 30 17 13
57%
2 RHK Type 6 47.47 32 20 12
62%
2 RHK Type 7 44.7 30 24 6
80%
2 RHK Type 8 56.94 38 0 38
0%
3 RHK Type 11 56.6 8 0 8
0%
3 RHK Type 2 56.94 8 8 0
100%

Rna Viva Tower I

Type Carpet (sq.ft) Total Booked Available Status
2RHK TYPE 10 56.94 4 0 4
0%
2RHK TYPE 12 56.6 4 0 4
0%
2RHK TYPE 4 45.18 15 8 7
53%
2RHK TYPE 6 47.47 16 3 13
19%
2RHK TYPE 7 44.7 15 3 12
20%
2RHK TYPE 8 56.94 19 0 19
0%
3RHK TYPE 11 56.6 4 0 4
0%
3RHK TYPE 2 56.94 4 4 0
100%

Construction Progress

RNA VIVA Tower E and F

Basement (if any)90%

Rna Viva Tower E And F

Excavation100%

RNA VIVA Tower E and F

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.52%

Rna Viva Tower E And F

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate1%

RNA VIVA Tower E and F

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.1%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises62%

Rna Viva Tower E And F

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises62%

RNA VIVA Tower E and F

Plinth90%
Podiums (if any) 25%

Rna Viva Tower E And F

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises15%

RNA VIVA Tower E and F

Sanitary Fittings within the flats / premises15%
Slabs of Super Structure86%

Rna Viva Tower E And F

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.83%

RNA VIVA Tower E and F

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks83%

Rna Viva Tower E And F

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing52%
X number of Basement(s) and Plinth90%
X number of Podiums25%
X number of Slabs of Super Structure86%

RNA VIVA Tower G and H

Basement (if any)90%

Rna Viva Tower G And H

Excavation75%

RNA VIVA Tower G and H

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.46%

Rna Viva Tower G And H

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate1%

RNA VIVA Tower G and H

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.1%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises46%

Rna Viva Tower G And H

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises46%

RNA VIVA Tower G and H

Plinth90%
Podiums (if any) 20%

Rna Viva Tower G And H

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises12%

RNA VIVA Tower G and H

Sanitary Fittings within the flats / premises12%
Slabs of Super Structure86%

Rna Viva Tower G And H

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.72%

RNA VIVA Tower G and H

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks72%

Rna Viva Tower G And H

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing46%
X number of Basement(s) and Plinth90%
X number of Podiums20%
X number of Slabs of Super Structure86%

RNA VIVA Tower I

Basement (if any)90%

Rna Viva Tower I

Excavation75%

RNA VIVA Tower I

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.35%

Rna Viva Tower I

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate1%

RNA VIVA Tower I

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.1%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises44%

Rna Viva Tower I

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises44%
Overall Percentage of Completion of the work done For the entire Building /Wing53%

RNA VIVA Tower I

Plinth90%
Podiums (if any) 20%

Rna Viva Tower I

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises7%

RNA VIVA Tower I

Sanitary Fittings within the flats / premises7%
Slabs of Super Structure86%

Rna Viva Tower I

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.72%

RNA VIVA Tower I

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks72%

Rna Viva Tower I

Stilt Floor100%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing35%
X number of Basement(s) and Plinth90%
X number of Podiums20%
X number of Slabs of Super Structure86%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Covered Parking 62%
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.