Piramal Mahalaxmi Central Tower vs The Imperial I
A detailed comparison of Piramal Mahalaxmi Central Tower in Mahalaxmi and The Imperial I in Mahalaxmi. Compare pricing, RERA status, configurations, possession dates, and amenities to make an informed decision.

Piramal Mahalaxmi Central Tower

The Imperial I
Compare sizes and total prices
Recorded configurations and indicative prices. Unit availability, taxes, charges and the final quote need confirmation.
For 3 BHK, The Imperial I's recorded carpet area is 134 sq ft larger. Indicative totals: Piramal Mahalaxmi Central Tower ₹11.9 crore; The Imperial I ₹15.84 crore.
| Configuration | Piramal Mahalaxmi Central Tower | The Imperial I |
|---|---|---|
| 3 BHK · carpet area | 1,450 sq ft | 1,584 sq ft |
| 3 BHK · indicative total price | ₹11.9 crore | ₹15.84 crore |
| 4 BHK · carpet area | Not recorded | 1,749 sq ft |
| 4 BHK · indicative total price | Not recorded | ₹17.49 crore |
| 5 BHK · carpet area | Not recorded | 3,198 sq ft / 4,322 sq ft |
| 5 BHK · indicative total price | Not recorded | ₹31.98 crore / ₹43.22 crore |
Project record updates: Piramal Mahalaxmi Central Tower — 25 September 2026; The Imperial I — 30 May 2026. These dates do not confirm when a price was last verified. “Not recorded” does not mean unavailable.
📊 Side-by-Side Comparison
| Parameter | Piramal Mahalaxmi Central Tower | The Imperial I |
|---|---|---|
| Location | Mahalaxmi, Near Jacob Circle | Mahalaxmi, Tardeo |
| Developer | Piramal Realty | S D Corporation Pvt. Ltd. |
| Construction Status | Ready Possession | Under Construction |
| Indicative rate per sq.ft. | ₹82,069 | ₹100,000 |
| Recorded possession target | Jun 2026 | Dec 2029 |
| Configurations | 3 BHK | 3 BHK, 4 BHK, 5 BHK |
| RERA Number | P51900016482 | P51900050473 |
| Project Type | Residential | Residential |
| Floors | 63 | 27 |
| Recorded feature labels | 33 | 38 |
Plans and brochures
Piramal Mahalaxmi Central Tower
Brochure recorded; request the latest version from our advisor.
Request documents from an advisorThe Imperial I
No verified floor-plan link is currently recorded.
A brochure is not currently recorded here. Our advisor can check the correct project documents.
Request documents from an advisorFacilities and specifications
Piramal Mahalaxmi Central Tower
24x7 SecurityAir ConditionersCCTVClub HouseClubhouseConcealed PlumbingConcealed WiringGardenGrand entrance lobbyGranite PlatformGymnasiumHealth ClubHigh speed elevatorsIndoor GamesIntercomJogging TrackKids Play AreaKitchen CabinetsModern ElevatorsModular KitchenMulti Purpose HallOutdoor GamesPOP finished wallsParkingPiped GasPower BackupSpaSports CourtSwimming PoolVideo Door PhoneVitrified flooringWater HarvestingYoga RoomThe Imperial I
24x7 SecurityAC LiftsBare ShellCCTVClubhouseConcealed PlumbingConcealed WiringDesigner FittingsEV ChargingFire SafetyGardenGated CommunityGymnasiumIndoor GamesInfinity PoolIntercomJogging TrackKids Play AreaLibraryMini TheatreModern ElevatorsMultipurpose HallParkingParty LawnPower BackupPrivate PoolSenior Citizen AreaServant QuarterSpaSports CourtSwimming PoolTerrace GardenVideo Door PhoneVisitor ParkingVitrified TilesWater HarvestingWooden FlooringYoga Room❓ Frequently Asked Questions
How do the recorded prices compare?
Piramal Mahalaxmi Central Tower has the lower recorded indicative rate, by ₹17,931/sq ft. Compare the configuration-level total prices and carpet areas above. A lower rate does not necessarily mean a lower total price; confirm the exact unit and charges with an advisor.
What are the recorded possession targets?
Piramal Mahalaxmi Central Tower: Jun 2026. The Imperial I: Dec 2029. These are recorded targets, not delivery guarantees. Confirm the applicable tower and phase on MahaRERA and with the developer.
Which RERA records apply?
Piramal Mahalaxmi Central Tower: P51900016482. The Imperial I: P51900050473. Verify the relevant project phase on the official MahaRERA website.
How should I compare the listed features?
These records mix facilities and specifications, and may use different names for similar features. A longer list does not establish a better project. Confirm which features apply to your tower and unit, and compare the ones that matter to you.
