Piramal Revanta Vana vs Kalpataru Summit
A detailed comparison of Piramal Revanta Vana in Mulund West and Kalpataru Summit in Mulund West. Compare pricing, RERA status, configurations, possession dates, and amenities to make an informed decision.

Piramal Revanta Vana

Kalpataru Summit
Compare sizes and total prices
Recorded configurations and indicative prices. Unit availability, taxes, charges and the final quote need confirmation.
| Configuration | Piramal Revanta Vana | Kalpataru Summit |
|---|---|---|
| 2 BHK · carpet area | 638 sq ft / 810 sq ft | Not recorded |
| 2 BHK · indicative total price | ₹2.39 crore / ₹3.03 crore | Not recorded |
| 2½ BHK · carpet area | 969 sq ft | Not recorded |
| 2½ BHK · indicative total price | ₹3.63 crore | Not recorded |
| 3 BHK · carpet area | 1,138 sq ft / 1,279 sq ft / 1,381 sq ft | Not recorded |
| 3 BHK · indicative total price | ₹3.62 crore / ₹4.07 crore / ₹4.39 crore | Not recorded |
| OFFICE SPACE · carpet area | Not recorded | 465 sq ft / 770 sq ft / 790 sq ft / 973 sq ft |
| OFFICE SPACE · indicative total price | Not recorded | ₹1.67 crore / ₹2.77 crore / ₹3.5 crore / ₹8.84 crore |
Project record updates: Piramal Revanta Vana — 06 June 2026; Kalpataru Summit — 13 September 2026. These dates do not confirm when a price was last verified. “Not recorded” does not mean unavailable.
📊 Side-by-Side Comparison
| Parameter | Piramal Revanta Vana | Kalpataru Summit |
|---|---|---|
| Location | Mulund West, LBS Marg | Mulund West, Lal Bahadur Shastri Marg |
| Developer | Piramal Realty | Kalpataru Limited |
| Construction Status | Under Construction | OC Received |
| Indicative rate per sq.ft. | ₹34,625 | ₹36,000 |
| Recorded possession target | Dec 2028 | Dec 2026 |
| Configurations | 2 BHK, 2½ BHK, 3 BHK | Office Space |
| RERA Number | N/A | P51800033272 |
| Project Type | Residential | Commercial |
| Floors | 45 | 33 |
| Recorded feature labels | 16 | 17 |
Plans and brochures
Piramal Revanta Vana
Brochure recorded; request the latest version from our advisor.
Request documents from an advisorKalpataru Summit
Brochure recorded; request the latest version from our advisor.
Request documents from an advisorFacilities and specifications
Piramal Revanta Vana
Air Conditioned LobbyAir ConditionersClub HouseConcealed PlumbingGrand entrance lobbyGranite PlatformGymnasiumImported Sanitary FittingsIndoor GamesIntercom/CCTVJogging TrackModular KitchenMulti Purpose HallPower BackupReception DeskSecurity Help DeskKalpataru Summit
Air Conditioned LobbyAluminium Sliding WindowsAmple Car ParkingBusiness CentreDouble-Heighted LobbyEnergy Efficient BuildingGrand entrance lobbyGranite PlatformHigh speed elevatorsImported Sanitary FittingsLandscape AreaMultitier SecurityPOP finished wallsReception DeskRelaxation AreaSecurity Help DeskWell-Planned Retail Spaces❓ Frequently Asked Questions
How do the recorded prices compare?
Piramal Revanta Vana has the lower recorded indicative rate, by ₹1,375/sq ft. Compare the configuration-level total prices and carpet areas above. A lower rate does not necessarily mean a lower total price; confirm the exact unit and charges with an advisor.
What are the recorded possession targets?
Piramal Revanta Vana: Dec 2028. Kalpataru Summit: Dec 2026. These are recorded targets, not delivery guarantees. Confirm the applicable tower and phase on MahaRERA and with the developer.
Which RERA records apply?
Piramal Revanta Vana: Not recorded. Kalpataru Summit: P51800033272. Verify the relevant project phase on the official MahaRERA website.
How should I compare the listed features?
These records mix facilities and specifications, and may use different names for similar features. A longer list does not establish a better project. Confirm which features apply to your tower and unit, and compare the ones that matter to you.
