EMPIRE TOWERS

by LAKHANI REALTY LLP Partnership
Certificate Signed P51700005215
💬 WhatsApp 📞 Call

Project Information

RERA Certificate No.
P51700005215
Registration No.
REA51700010441
Registration Date
2023-02-14
Developer
LAKHANI REALTY LLP Partnership
Architect
Io Folds Architects & Consultants
Project Bank
HDFC BANK
Proposed Possession
2024-07-31
Revised Possession
2024-07-31
Extended Possession
2025-07-29
Total Units
67
Units Sold
30 (45%)
Buildings
6
Project Area
6985.43 sq.m
Total FSI
17011.53
Approved FSI
7927.62
MahaRERA QR
EMPIRE TOWERS
MahaRERA — P51700005215
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors3
Sanctioned3
⬇️Basements2
🅿️Closed Parking20
📅Completion2024-07-31
📅Completion2023-07-31
🏗️Proposed Floors37
Sanctioned37
🏠Habitable35
🔢Total Units1
🏡Residential1
⬇️Basements2
🅿️Closed Parking162
📅Completion2023-07-31
📅Completion2023-07-31
🏗️Proposed Floors37
Sanctioned37
🏠Habitable35
🔢Total Units66
🏡Residential66
⬇️Basements2
🅿️Closed Parking162
📅Completion2023-07-31
📅Completion2023-07-31

Apartment Configurations

None

Type Carpet (sq.ft) Total Booked Available Status
0 0 0
0%
2.5 Bhk 90.44999694824219 0 0 0
0%
2Bhk 56.95000076293945 0 0 0
0%
2Bhk 62.40999984741211 0 0 0
0%
2Bhk 74.05999755859375 0 0 0
0%
3Bhk 81.02999877929688 0 0 0
0%
3Bhk 81.12999725341797 0 0 0
0%
3Bhk 85.4800033569336 0 0 0
0%
3Bhk 100.19999694824219 0 0 0
0%
3Bhk 101.66999816894531 0 0 0
0%
4Bhk 179.3300018310547 0 0 0
0%
4Bhk 188.05999755859375 0 0 0
0%
4Bhk 207.08999633789062 0 0 0
0%
4Bhk 207.38999938964844 0 0 0
0%
5Bhk &Amp;Amp;Amp;Amp; More 207.08999633789062 0 0 0
0%
5Bhk &Amp;Amp;Amp;Amp;Amp;Amp; More 207.38999938964844 0 0 0
0%
Office 1 1St Floor 138.2899932861328 0 0 0
0%
Office 2 1St Floor 105.30000305175781 0 0 0
0%
Office 3 1St Floor 142.58999633789062 0 0 0
0%
Office 4 1St Floor 421.760009765625 0 0 0
0%
Shop 0 0 0
0%
Shop 01 72.5999984741211 0 0 0
0%
Shop 02 28.219999313354492 0 0 0
0%
Shop 03 72.61000061035156 0 0 0
0%
Shop 04 41.619998931884766 0 0 0
0%
Shop 05 54.459999084472656 0 0 0
0%
Shop 06 53.7400016784668 0 0 0
0%
Shop 07 54.54999923706055 0 0 0
0%
Shop 08 41.619998931884766 0 0 0
0%
Shop 09 A 35.209999084472656 0 0 0
0%
Shop 09 B 35.209999084472656 0 0 0
0%
Shop 10 28.209999084472656 0 0 0
0%
Shop 11 35.209999084472656 0 0 0
0%
Shop 12 35.209999084472656 0 0 0
0%
Shop 13 41.619998931884766 0 0 0
0%
Shop 14 56.31999969482422 0 0 0
0%
Shop 15 56.47999954223633 0 0 0
0%
Shop 16 58.279998779296875 0 0 0
0%
Shop 17 A 7.800000190734863 0 0 0
0%
Shop 18 34.20000076293945 0 0 0
0%
Shop 19 29.90999984741211 0 0 0
0%
Shop 20 30.530000686645508 0 0 0
0%
Shop 3 1St Floor 72.12999725341797 0 0 0
0%
Shop 4 1St Floor 42.189998626708984 0 0 0
0%
Shop 9B 1St Floor 72.68000030517578 0 0 0
0%

Commercial

Type Carpet (sq.ft) Total Booked Available Status
Shop 28.22 1 1 0
100%
Shop 28.27 1 1 0
100%
Shop 29.93 1 1 0
100%
Shop 30.56 1 1 0
100%
Shop 32.94 1 0 1
0%
Shop 34.2 1 1 0
100%
Shop 35.21 2 2 0
100%
Shop 41.52 1 1 0
100%
Shop 41.74 1 0 1
0%
Shop 53.75 1 1 0
100%
Shop 54.56 2 1 1
50%
Shop 56.45 1 1 0
100%
Shop 56.6 1 1 0
100%
Shop 58.34 1 1 0
100%
Shop 72.61 2 1 1
50%
Shop 107.87 1 1 0
100%
Shop 156.84 1 1 0
100%

Commercial Prop

Type Carpet (sq.ft) Total Booked Available Status
Shop 29.02 1 0 1
0%
Shop 29.04 1 0 1
0%
Shop 33.82 1 0 1
0%
Shop 37.47 1 0 1
0%
Shop 57.79 1 0 1
0%

Legacy

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 56.95 1 1 0
100%
2 BHK 62.41 20 14 6
70%
3 BHK 81.03 1 1 0
100%
3 BHK 85.48 11 6 5
55%
3 BHK 100.2 1 0 1
0%
3 BHK 101.67 32 20 12
62%
4 BHK 179.33 1 1 0
100%
5 BHK & more 207.39 4 3 1
75%

Legacy Proposed

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 62.41 2 0 2
0%
3 BHK 101.67 2 0 2
0%
4 BHK 207.39 1 0 1
0%

Legend

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 74.06 28 25 3
89%
3 BHK 81.03 1 1 0
100%
3 BHK 85.48 10 7 3
70%
3 BHK 101.67 35 19 16
54%
4 BHK 188.06 1 1 0
100%
5 BHK & more 207.09 5 2 3
40%

Legend Proposed

Type Carpet (sq.ft) Total Booked Available Status
2 BHK 74.06 2 0 2
0%
3 BHK 101.67 2 0 2
0%
4 BHK 207.09 1 0 1
0%

Construction Progress

COMMERCIAL

Basement (if any)100%

Commercial

Excavation100%

COMMERCIAL

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%

Commercial

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

COMMERCIAL

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%

Commercial

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises72%

COMMERCIAL

Plinth100%
Podiums (if any) 0%

Commercial

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises70%

COMMERCIAL

Sanitary Fittings within the flats / premises90%
Slabs of Super Structure100%

Commercial

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

COMMERCIAL

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Commercial

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing63%
X number of Basement(s) and Plinth100%
X number of Podiums0%
X number of Slabs of Super Structure100%

COMMERCIAL PROP

Basement (if any)0%

Commercial Prop

Excavation0%

COMMERCIAL PROP

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Commercial Prop

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

COMMERCIAL PROP

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Commercial Prop

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%

COMMERCIAL PROP

Plinth0%
Podiums (if any) 0%

Commercial Prop

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

COMMERCIAL PROP

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

Commercial Prop

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

COMMERCIAL PROP

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Commercial Prop

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

LEGACY

Basement (if any)100%

Legacy

Excavation100%

LEGACY

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.62%

Legacy

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

LEGACY

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises68%

Legacy

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises60%

LEGACY

Plinth100%
Podiums (if any) 90%

Legacy

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises25%

LEGACY

Sanitary Fittings within the flats / premises50%
Slabs of Super Structure90%

Legacy

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.58%

LEGACY

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks65%

Legacy

Stilt Floor90%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing40%
X number of Basement(s) and Plinth100%
X number of Podiums90%
X number of Slabs of Super Structure90%

LEGACY PROPOSED

Basement (if any)0%

Legacy Proposed

Excavation0%

LEGACY PROPOSED

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Legacy Proposed

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

LEGACY PROPOSED

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Legacy Proposed

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%

LEGACY PROPOSED

Plinth0%
Podiums (if any) 0%

Legacy Proposed

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

LEGACY PROPOSED

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

Legacy Proposed

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

LEGACY PROPOSED

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Legacy Proposed

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

LEGEND

Basement (if any)85%

Legend

Excavation100%

LEGEND

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%

Legend

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate4%

LEGEND

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises68%

Legend

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises60%

LEGEND

Plinth85%
Podiums (if any) 40%

Legend

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises30%

LEGEND

Sanitary Fittings within the flats / premises50%
Slabs of Super Structure96%

Legend

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.55%

LEGEND

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks65%

Legend

Stilt Floor70%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing55%
X number of Basement(s) and Plinth85%
X number of Podiums40%
X number of Slabs of Super Structure90%

LEGEND PROPOSED

Basement (if any)0%

Legend Proposed

Excavation0%

LEGEND PROPOSED

External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%

Legend Proposed

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%

LEGEND PROPOSED

Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%

Legend Proposed

Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%

LEGEND PROPOSED

Plinth0%
Podiums (if any) 0%

Legend Proposed

Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%

LEGEND PROPOSED

Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%

Legend Proposed

Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%

LEGEND PROPOSED

Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%

Legend Proposed

Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

RERA Registered Amenities

Aggregate area of recreational Open Space 15%
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station 20%
Energy management
Fire Protection And Fire Safety Requirements 30%
Landscaping & Tree Planting 25%
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP) 6%
Solid Waste Management And Disposal
Storm Water Drains 36%
Street Lighting 25%
Treatment And Disposal Of Sewage And Sullage Water 25%
Water Conservation, Rain water Harvesting 50%
Water Supply
Call WhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.