S
✓ MahaRERA P51800055568RERA: no litigation reported27
Units
2025
Possession
1
Buildings
Certificate Signed
Status
Lifecycle requires verification
Ask an advisor to verify the current project and inventory status.
Source stage: New · mapped resale: 0 · mapped rental: 0 · primary status: not confirmed
01
Possession Timeline
Proposed
Dec 2025
Status
New
02
Unit Configurations (per MahaRERA)
ConfigurationCarpetIndicative Price
2 BHK513–548 ft²On request
Existing Member513–548 ft²On request
3 BHK801 ft²On request
Configurations & carpet per MahaRERA filing · indicative price = locality rate × carpet (not the developer's quote).
💬 Verify current inventory with an advisor03
RERA Trust Record
MahaRERA No.
P51800055568
Registered
2024-04-02
Litigation
No reported in source
Escrow Bank
KOTAK MAHINDRA BANK LIMITED
Architect
Ar Design Studio
Total FSI
5484
04
Buildings · 1 Wing(s)
Shree Hari Krupa Building No 2— floors · — units
05
Land DNA · Genesis
Redevelopment / SRA / MHADA / MMRDA / Freehold — provenance from MPE's verification layer. The genesis no portal shows.
06
Location
📍 Malad West
▸ Explore map & Street View — for verified buyers
07
Promoter & Professionals
MAMTORA FOUNDATIONNA
AR DESIGN STUDIOArchitect
MS A R MEHTA AND ASSOCIATESArchitect
09
Construction Progress
48% avgExcavation100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
Sanitary Fittings within the flats / premises45%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.2%
Basement (if any)0%
Podiums (if any) 0%
Stilt Floor 0%
10
Amenities
Electrical Meter Room, Sub-Station, Receiving StationFire Protection And Fire Safety RequirementsLandscaping & Tree PlantingLandscaping & Tree PlantingSolid Waste Management And DisposalStorm Water DrainsWater Conservation, Rain water HarvestingWater SupplyWater conservation /Rain water harvesting
12
Talk to our MahaRERA advisor
Tell our MahaRERA advisor what you need and they'll guide you on this project.
💬 Verify current project inventory08
Property Rates in Malad West
Residential · Sale
₹30,000–55,000/sqft
Commercial · Sale
₹30,000–40,000/sqft
2 BHK · Rent
₹55,000–105,000/mo
Full rates
09
Resale Flats for Sale in Malad West
410
Flats for Rent in Malad West
211
Commercial for Sale in Malad West
312
Commercial for Lease in Malad West
413
Commercial Projects in Malad West
14
More by Mamtora Foundation
15
MahaRERA projects nearby in Malad West
Avira Jewellery Hub228 unitsShreeji Atlantis Wing B208 unitsMarquis Residences Phase 2186 unitsSheetal Sagar Darshan And Vanashree159 unitsKojar Imperia118 unitsGeetanjali Paradise115 unitsSiddha Shila99 unitsShreeji Eternity Wing - D81 unitsMeghmala Crysta75 unitsNikitara70 unitsPalash67 unitsSheetal Anupam60 units
?
Frequently Asked Questions
When is possession of Shree Hari Krupa?
As per MahaRERA, proposed possession is Dec 2025.
Is Shree Hari Krupa RERA-registered?
Yes — MahaRERA registration P51800055568, registered 2024-04-02. The current MahaRERA source record reports no litigations.
Who is the developer?
Mamtora Foundation — 4 projects tracked on Mumbai Property Exchange. View their track record ▸
How do I book or get more details?
Tap WhatsApp or Call below to speak with a Mumbai Property Exchange advisor — serving Mumbai since 1995 · RERA-registered since 2017.




