Trilok Park

by Rajesh Trilokchand Chopra Individual
Certificate SignedP51800033509
Trilok ParkProject photos will appear here when available.

Project Information

RERA Certificate No.
P51800033509
Registration No.
REA51800103208
Registration Date
2022-02-22
Developer
Rajesh Trilokchand Chopra Individual
Project Bank
ICICI BANK LIMITED
Proposed Possession
2025-12-30
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Total Units
142
Units Sold
77 (54%)
Buildings
3
Project Area
2152.70 sq.m
Total FSI
8393.00
Approved FSI
6393.00
MahaRERA QR
Trilok Park
MahaRERA — P51800033509
Scan to verify on MahaRERA portal

Wing-wise Details

🏗️Proposed Floors14
✅Sanctioned14
🏠Habitable13
🔢Total Units52
🏡Residential46
🏢Non-Residential6
🏗️Proposed Floors14
✅Sanctioned14
🏠Habitable12
🔢Total Units45
🏡Residential45
🏗️Proposed Floors14
✅Sanctioned14
🏠Habitable12
🔢Total Units45
🏡Residential45

Apartment Configurations

WING A

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK37.6213121
92%
1BHK Existing Tenant37.6917017
0%
2BHK58.52770
100%
2BHK Existing Tenant58.63909
0%
Shop Existing Tenant23.87202
0%
Shop Existing Tenant27.22101
0%
Shop Existing Tenant27.82101
0%
Shop Existing Tenant28.2101
0%
Shop Existing Tenant29.41101
0%

WING B

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK37.6223203
87%
1BHK Existing Tenant37.6918018
0%
2BHK46.45110
100%

WING C

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1BHK37.6216142
88%
1BHK Existing Tenant37.69606
0%
2BHK50.1620200
100%
3BHK58.52110
100%

Construction Progress

WING A

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.55%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises55%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
Stilt Floor100%

WING B

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

WING C

Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%

RERA Registered Amenities

⬜Aggregate area of recreational Open Space
⬜Community Buildings
✅Electrical meter room, sub-station, receiving station100%
✅Energy managemcnt100%
✅Fire protection and fire safety requirements100%
⬜Internal Roads & Footpaths
✅Landscaping & Tree Planting100%
⬜Open Parking
✅Sewerage (Chamber, Lines, Septic Tank , STP)100%
✅Solid Waste Management And Disposal100%
✅Storm Water Drains100%
⬜Street Lighting
⬜Treatment And Disposal Of Sewage And Sullage Water
✅Water Supply100%
✅Water conservation /Rain water harvesting100%