₹17,725 Crore Metro 13 Approved from Mira-Bhayandar to Virar

Maharashtra has approved Mumbai Metro Line 13, a ₹17,724.99 crore corridor connecting Mira-Bhayandar with Vasai-Virar.
The 25.03 km route will have 16 stations, with 21.78 km running elevated and 3.25 km underground. The corridor will pass through key residential markets including Mira Road, Vasai, Naigaon, Nalasopara and Virar.
For homebuyers, the significance lies in improved connectivity across one of the MMR's largest residential belts. These locations have historically depended heavily on the Western Railway suburban network and road transport for longer commutes.
Metro 13 will also connect with the existing and upcoming metro network and provide links with suburban railway stations at Naigaon, Nalasopara and Virar.
From a real-estate perspective, better public transport can widen the number of locations buyers consider when comparing homes across the western MMR. However, property appreciation should not be assumed purely on the basis of infrastructure announcements. Actual benefits depend on station accessibility, execution timelines and surrounding development.
Key takeaway: Metro 13 could significantly improve connectivity between Mira-Bhayandar and Vasai-Virar, strengthening accessibility across major residential markets in the western MMR.
Looking to buy or rent in Mumbai?
Talk to a Mumbai property advisory and data platform operating since 1995. Availability is reconfirmed before visits.
New · drive before you visit
Drive to new projects in Bhayandar from your place
Tell us where you start and your budget. We pick the projects in Bhayandar that fit, plan the order and drive you there — drive time with Mumbai traffic, what you pass, and the street view at each gate.
Related news
- Bombay High Court Denies Relief to 41 Illegal Vasai Buildings Facing Demolition · 10 Jul 2024
- Sunteck Beach Residences Vasai · 30 May 2022
- Mumbai MMR Targets $1.5 Trillion Economy by 2047 · 04 Sep 2026
- Maharashtra clears ₹22,611 crore in metro, tunnel and elevated-corridor projects for the MMR · 11 Jun 2026
- Mumbai to see five MMRDA projects open, spanning monorail to flyovers · 02 Jun 2026
- Bombay HC orders residents of dilapidated Vasai buildings to vacate · 28 Aug 2025
More Property News












💬 Comments