✓ MahaRERA P51700076717RERA: no litigation reportedAnand Imperial
by Anand Developers
📍 Kongaon, Thane · 421311
140
Units
2028
Possession
2
Buildings
Certificate Signed
Status
Lifecycle requires verification
Ask an advisor to verify the current project and inventory status.
Source stage: New · mapped resale: 0 · mapped rental: 0 · primary status: not confirmed
01
Possession Timeline
Proposed
Mar 2028
Status
New
02
Unit Configurations (per MahaRERA)
ConfigurationCarpetIndicative Price
1 BHK409 ft²On request
1 BHK Landowner409 ft²On request
2 BHK524 ft²On request
Shop Landowner144–1,284 ft²On request
Shop148–1,284 ft²On request
Configurations & carpet per MahaRERA filing · indicative price = locality rate × carpet (not the developer's quote).
💬 Verify current inventory with an advisor03
RERA Trust Record
MahaRERA No.
P51700076717
Registered
2024-06-21
Litigation
No reported in source
Escrow Bank
THE COSMOS CO OPERATIVE BANK LIMITED
Architect
K K And Associates
Total FSI
9294
04
Buildings · 2 Wing(s)
Wing A5 floors · — units
Wing B10 floors · — units
05
Land DNA · Genesis
Redevelopment / SRA / MHADA / MMRDA / Freehold — provenance from MPE's verification layer. The genesis no portal shows.
06
Location
📍 Kongaon
19.25,73.102475
19.25,73.102475
▸ Explore map & Street View — for verified buyers
07
Promoter & Professionals
Ambavi Dharamshi BeraPartner
Laxman Dharamshi PatelPartner
09
Construction Progress
39% avgBasement (if any)100%
Excavation100%
Plinth100%
X number of Basement(s) and Plinth100%
Slabs of Super Structure50%
X number of Slabs of Super Structure50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks24%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.24%
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
10
Amenities
COVERED PARKINGElectrical Meter Room, Sub-Station, Receiving StationEnergy managementFire Protection And Fire Safety RequirementsLandscaping & Tree PlantingOpen ParkingSewerage (Chamber, Lines, Septic Tank , STP)Solid Waste Management And DisposalStorm Water DrainsStreet LightingTreatment And Disposal Of Sewage And Sullage WaterWater Conservation, Rain water HarvestingWater Supply
12
Talk to our MahaRERA advisor
Tell our MahaRERA advisor what you need and they'll guide you on this project.
💬 Verify current project inventory14
More by Anand Developers
15
MahaRERA projects nearby in Kongaon
?
Frequently Asked Questions
When is possession of Anand Imperial?
As per MahaRERA, proposed possession is Mar 2028.
Is Anand Imperial RERA-registered?
Yes — MahaRERA registration P51700076717, registered 2024-06-21. The current MahaRERA source record reports no litigations.
Who is the developer?
Anand Developers — 3 projects tracked on Mumbai Property Exchange.
How do I book or get more details?
Tap WhatsApp or Call below to speak with a Mumbai Property Exchange advisor — serving Mumbai since 1995 · RERA-registered since 2017.