Dadar West · Mumbai
Kohinoor Square Phase 2
Dadar West · by Kohinoor Constructions
Updated Sep 2026
Dadar WestPhotos from the project record · tap to enlarge
A first look at Kohinoor Square Phase 2
Kohinoor Square Phase 2 is a residential project in Dadar West, Mumbai 400028. It is registered with MahaRERA under P51900012308 (registered 2021-09-09). The project has 121 units across 1 building of up to 40 floors. It offers 3 BHK homes with carpet areas of 1,564–2,050 sq ft, priced ₹8.84 Cr–₹10.98 Cr as on 09 Jul 2026 (indicative). MahaRERA proposed possession: Dec 2023.
Ask an advisor to verify the current project and inventory status.
Part of Kohinoor Square Altissimo, Dadar West
Other wings & phases: Kohinoor Square Phase 1
Availability & Pricing
Prices as on 09 Jul 2026. Approximate pricing as on that date. Prices are indicative, subject to change and to reconfirmation with the developer.
💬 Request latest price on WhatsAppKohinoor Square Phase 2 floor plans
2Floor plans are indicative, as shared by the developer, and subject to change.
About Kohinoor Square Phase 2
Location
Kohinoor Square Phase 2 is located in Dadar West, Mumbai 400028, in the Mumbai City district. Across 27 recent resale listings on MPE, homes in Dadar West have a median asking rate of ₹50,000 per sq ft, and a 2 BHK typically rents for about ₹1.25 Lac a month.
MahaRERA record
The MahaRERA registration number is P51900012308, issued on 9 September 2021. The registered promoter is Kohinoor Ctnl Infrastructure Company Private Limited. The filing lists 1 wing: Wing C Comprising of Residential, Energy Centre, C over 40 floors. Per the registration, the architect on record is Sandeep Shikre & Associates and the project escrow account is with Axis Bank.
Homes and prices
Homes on offer are 2½ BHK of 1,564 sq ft at ₹8.84 Cr; 3 BHK of 1,725 sq ft at ₹9.8 Cr; 3½ BHK of 1,896–2,050 sq ft at ₹10.18 Cr–₹10.98 Cr (carpet area), as on 09 Jul 2026. That works out to about ₹53,600–₹56,800 per sq ft of carpet, 13% above the locality's resale median. Prices are indicative and should be reconfirmed with the developer before booking.
Construction and possession
The latest MahaRERA progress report shows foundation at 60%, structure at 100%, finishing at 100%, services at 100%. Proposed possession is Dec 2023.
Developer track record
Kohinoor Constructions has 10 projects tracked on Mumbai Property Exchange, 7 of them delivered (ready or sold out). Other projects by the same developer include Keshav Kohinoor, Kohinoor Prime, Kohinoor Highland.
Buyer demand in Dadar West
In the last 90 days, buyers and tenants registered 12 requirements for Dadar West with Mumbai Property Exchange, 5 of them to buy and 3 specifically for 3 BHK homes.
Developer's description ▾
Upcoming projects & infrastructure in Dadar West
take an informed decision14 MahaRERA projects are due to hand over in Dadar West between 2026 and 2030; the nearest upcoming infrastructure to Kohinoor Square Phase 2 is the Line 4 Green, 2.3 km away (under construction · due 2027).
- 🚇Line 3 AquaOpened 20250.6 km
- 🚇Line 4 GreenUnder construction · due 20272.3 km
- 🚇Line 11 GreenApproved2.3 km
- 🛣️Coastal Road (Phase 1)Opened 20242.8 km
- 🛣️Worli-Sewri ConnectorUnder construction · due 20263.0 km
- 🌉Versova-Bandra Sea LinkUnder construction · due 20283.2 km
🔒 Units handing over each year · price by BHK · years to absorb supply · competing projects · infra impact on prices
Prices and timelines are indicative and subject to change. See the disclaimer at the foot of this page.
Dadar West — resale, rent & yield
From MPE live listings, last 18 months · Mumbai price index ›
Unit Configurations (per MahaRERA)
RERA record & possession
Buildings · 1 wing
Location
Construction progress
per MahaRERASee all 11 stages ▾
Amenities
14+6 more ▾
Connectivity
Talk to our MahaRERA advisor
Tell our MahaRERA advisor what you need and they'll guide you on this project.
💬 Verify current project inventoryDadar West market context
Property Rates in Dadar West
Resale Flats for Sale in Dadar West
4Flats for Rent in Dadar West
3Commercial for Sale in Dadar West
1Commercial for Lease in Dadar West
2More by Kohinoor Constructions
MahaRERA projects nearby in Dadar West
Next steps — clarity before you step out
Buying a home is not a quick decision. In association with developers, Mumbai Property Exchange sets up the video briefings, the site visits and the paperwork questions — so your homework is done before you commit an afternoon.
Frequently Asked Questions
Where is Kohinoor Square Phase 2 located?
Kohinoor Square Phase 2 is in Dadar West, Mumbai 400028.
What is the price of Kohinoor Square Phase 2?
3 BHK homes are priced ₹8.84 Cr–₹10.98 Cr as on 09 Jul 2026. Prices are indicative and subject to reconfirmation with the developer.
What configurations and carpet areas does Kohinoor Square Phase 2 offer?
2½ BHK – 1,564 sq ft carpet at ₹8.84 Cr; 3 BHK – 1,725 sq ft carpet at ₹9.8 Cr; 3½ BHK – 1,896 sq ft carpet at ₹10.18 Cr; 3½ BHK – 2,050 sq ft carpet at ₹10.98 Cr.
When is possession of Kohinoor Square Phase 2?
As per MahaRERA, proposed possession is Dec 2023.
Is Kohinoor Square Phase 2 RERA-registered?
Yes — MahaRERA registration P51900012308, registered 2021-09-09.
How many units does Kohinoor Square Phase 2 have?
MahaRERA records 121 units across 3 buildings, up to 40 floors.
Who is the developer of Kohinoor Square Phase 2?
Kohinoor Constructions — 10 projects tracked on Mumbai Property Exchange. View their track record ▸
How many new projects are coming up in Dadar West?
14 MahaRERA-registered projects in Dadar West are due for possession between 2026 and 2030, as per MahaRERA registrations. Timelines can change.
What metro and infrastructure is near Kohinoor Square Phase 2?
Line 3 Aqua — opened 2025, 0.6 km away; Line 4 Green — under construction · due 2027, 2.3 km away; Line 11 Green — approved, 2.3 km away; Coastal Road (Phase 1) — opened 2024, 2.8 km away. Timelines are as announced and can change.
How do I book or get more details?
Tap WhatsApp or Call below to speak with a Mumbai Property Exchange advisor — serving Mumbai since 1995 · RERA-registered since 2017.


