KRISHNA NAGRIProject photos will appear here when available.
Project Information
RERA Certificate No.
P99000005597
Registration No.
REA99000015031
Registration Date
2021-09-09
Developer
KRISHNA DEVELOPERS Others
Architect
Nishant Patil
Project Bank
INDUSIND BANK
Proposed Possession
2025-12-30
Revised Possession
2025-12-30
Extended Possession
1900-01-01
Units Sold
0
Buildings
11
Project Area
33000.00 sq.m
Total FSI
24509.00
Approved FSI
24509.00
KRISHNA NAGRI MahaRERA โ P99000005597
Scan to verify on MahaRERA portal
Wing-wise Details
๐๏ธProposed Floors6
โ Sanctioned6
๐๏ธProposed Floors6
โ Sanctioned6
๐๏ธProposed Floors6
โ Sanctioned6
๐๏ธProposed Floors6
โ Sanctioned6
๐๏ธProposed Floors6
โ Sanctioned6
๐๏ธProposed Floors6
โ Sanctioned6
๐๏ธProposed Floors6
โ Sanctioned6
๐๏ธProposed Floors6
โ Sanctioned6
๐๏ธProposed Floors6
โ Sanctioned6
๐๏ธProposed Floors4
โ Sanctioned4
๐๏ธProposed Floors4
โ Sanctioned4
Apartment Configurations
BUILDING NO 2 WING A AND B
Type
Carpet (sq.ft)
Total
Booked
Available
Status
RESIDENTIAL 1 BHK
28.01
8
8
0
100%
RESIDENTIAL 1 BHK
28.04
32
30
2
94%
RESIDENTIAL 1 BHK
32.06
2
1
1
50%
RESIDENTIAL 1 BHK
32.08
2
0
2
0%
RESIDENTIAL 2BHK
40.74
8
8
0
100%
SHOP
9.56
2
1
1
50%
SHOP
10.98
2
0
2
0%
SHOP
12.22
2
2
0
100%
SHOP
13.63
2
2
0
100%
SHOP
14.04
4
2
2
50%
SHOP
24.25
2
1
1
50%
BUILDING NO 2 WING C AND D
Type
Carpet (sq.ft)
Total
Booked
Available
Status
RESIDENTIAL 1BHK
28.01
8
5
3
62%
RESIDENTIAL 1BHK
28.04
32
26
6
81%
RESIDENTIAL 1BHK
32.06
2
0
2
0%
RESIDENTIAL 1BHK
32.08
2
1
1
50%
RESIDENTIAL 2BHK
40.74
8
8
0
100%
SHOP
9.56
2
0
2
0%
SHOP
10.98
2
0
2
0%
SHOP
12.22
2
0
2
0%
SHOP
13.63
2
0
2
0%
SHOP
14.04
4
0
4
0%
SHOP
24.25
2
0
2
0%
BUILDING NO 3 WING A AND B
Type
Carpet (sq.ft)
Total
Booked
Available
Status
RESIDENTIAL 1BHK
28.01
8
1
7
12%
RESIDENTIAL 1BHK
28.04
32
2
30
6%
RESIDENTIAL 1BHK
32.06
2
0
2
0%
RESIDENTIAL 1BHK
32.08
2
0
2
0%
RESIDENTIAL 2BHK
40.74
8
2
6
25%
SHOP
9.56
2
0
2
0%
SHOP
10.08
2
1
1
50%
SHOP
12.22
2
0
2
0%
SHOP
13.63
2
0
2
0%
SHOP
14.04
4
0
4
0%
SHOP
24.25
2
0
2
0%
BUILDING NO 3 WING C AND D
Type
Carpet (sq.ft)
Total
Booked
Available
Status
RESIDENTAL1BHK
32.08
2
0
2
0%
RESIDENTIAL1BHK
28.01
8
0
8
0%
RESIDENTIAL1BHK
28.04
32
0
32
0%
RESIDENTIAL1BHK
32.06
2
0
2
0%
RESIDENTIAL2BHK
40.74
8
0
8
0%
SHOP
9.56
2
0
2
0%
SHOP
10.98
2
0
2
0%
SHOP
12.22
2
0
2
0%
SHOP
13.63
2
0
2
0%
SHOP
14.04
4
0
4
0%
SHOP
24.25
2
0
2
0%
BUILDING NO 4 WING A AND B PRPOSED
Type
Carpet (sq.ft)
Total
Booked
Available
Status
RESIDENTIAL PRPOSED
1575.56
52
0
52
0%
SHOP PRPOSED
196.03
14
0
14
0%
BUILDING NO 4 WING C D AND E PRPOSED
Type
Carpet (sq.ft)
Total
Booked
Available
Status
RESIDENTIAL PRPOSED
2112.44
70
0
70
0%
SHOP PRPOSED
196.3
14
0
14
0%
BUILDING NO 5 WING A AND B PRPOSED
Type
Carpet (sq.ft)
Total
Booked
Available
Status
RESIDENTIAL PRPOSED
1575.56
52
0
52
0%
SHOP PRPOSED
196.3
14
0
14
0%
BUILDING NO 5 WING C D AND E
Type
Carpet (sq.ft)
Total
Booked
Available
Status
RESIDENTIAL PRPOSED
2112.44
70
0
70
0%
SHOP PRPOSED
196.3
14
0
14
0%
BUILDING NO 6 WING A B AND C PRPOSED
Type
Carpet (sq.ft)
Total
Booked
Available
Status
RESIDENTIAL PRPOSED
1457.04
48
0
48
0%
SHOP PRPOSED
266.44
21
0
21
0%
BUILDING NO 7 PRPOSED
Type
Carpet (sq.ft)
Total
Booked
Available
Status
COMMERCIAl
2104.14
14
0
14
0%
BUILDING NO 8 PRPOSED
Type
Carpet (sq.ft)
Total
Booked
Available
Status
SCHOOL PRPOSED
1219.32
1
0
1
0%
Construction Progress
BUILDING NO 2 WING A AND B
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
BUILDING NO 2 WING C AND D
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
BUILDING NO 3 WING A AND B
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises100%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
Stilt Floor100%
BUILDING NO 3 WING C AND D
Basement (if any)100%
Excavation100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Plinth100%
Podiums (if any)0%
Sanitary Fittings within the flats / premises80%
Slabs of Super Structure100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
Stilt Floor100%
BUILDING NO 4 WING A AND B PRPOSED
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
BUILDING NO 4 WING C D AND E PRPOSED
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
BUILDING NO 5 WING A AND B PRPOSED
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
BUILDING NO 5 WING C D AND E
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
BUILDING NO 6 WING A B AND C PRPOSED
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
BUILDING NO 7 PRPOSED
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
BUILDING NO 8 PRPOSED
Basement (if any)0%
Excavation0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Plinth0%
Podiums (if any)0%
Sanitary Fittings within the flats / premises0%
Slabs of Super Structure0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
Stilt Floor0%
RERA Registered Amenities
โ Aggregate area of recreational Open Space
โฌCommunity Buildings
โ Electrical meter room, sub-station, receiving station
โ Energy managemcnt
โฌFire protection and fire safety requirements
โ Internal Roads & Footpaths50%
โ Landscaping & Tree Planting
โฌOpen Parking
โ Sewerage (Chamber, Lines, Septic Tank , STP)20%
โ Solid Waste Management And Disposal
โ Storm Water Drains
โ Street Lighting50%
โ Treatment And Disposal Of Sewage And Sullage Water