📞 +91 98200 30685✉️
RERA: A51800043517

Redevelopment Of Glendon Chsl, Sheldon Chsl, Orlem Luciana Chsl

by Pranav Constructions Limited
Certificate SignedP51800076911

Project Information

RERA Certificate No.
P51800076911
Registration No.
REA51800160052
Registration Date
2024-08-13
Developer
Pranav Constructions Limited
Architect
Rasik P Hingoo And Associates
Project Bank
ICICI BANK LIMITED
Proposed Possession
2027-11-02
Revised Possession
1900-01-01
Extended Possession
1900-01-01
Total Units
117
Units Sold
39 (33%)
Buildings
2
Project Area
1740.10 sq.m
Total FSI
8535.56
Approved FSI
8535.56
MahaRERA QR
Redevelopment Of Glendon Chsl, Sheldon Chsl, Orlem Luciana Chsl
MahaRERA — P51800076911
Scan to verify on MahaRERA portal

Wing-wise Details

🚗Open Parking21
🅿️Closed Parking36
📅Completion2027-02-11
🚗Open Parking21
🅿️Closed Parking36
📅Completion2027-02-11

Apartment Configurations

Glendon Chsl, Sheldon Chsl, Orlem Luciana Chsl- W

TypeCarpet (sq.ft)TotalBookedAvailableStatus
1 BHK40.26505
0%
1 BHK40.4213013
0%
1 BHK REHAB40.06440
100%
1 BHK REHAB40.26110
100%
1 BHK REHAB40.42110
100%
1 BHK REHAB42.79110
100%
2 BHK63.35505
0%
2 BHK REHAB56.64330
100%
2 BHK REHAB58.96220
100%
2 BHK REHAB61.16110
100%
2 BHK REHAB62.39110
100%
2 BHK REHAB63.35110
100%
3 BHK90.7715015
0%
3 BHK REHAB78.41220
100%
3 BHK REHAB81.12110
100%
3 BHK REHAB85.76220
100%
SHOP REHAB72.97110
100%
Shop16.33101
0%
Shop17.83101
0%
Shop26.82101
0%
Shop33.62101
0%

Glendon Chsl, Sheldon Chsl, Orlem Lucianachsl- Wi

TypeCarpet (sq.ft)TotalBookedAvailableStatus
2 BHK50.08101
0%
2 BHK53.24101
0%
2 BHK54.0101
0%
2 BHK63.35505
0%
2 BHK63.58909
0%
2 BHK REHAB44.8220
100%
2 BHK REHAB50.08220
100%
2 BHK REHAB52.82110
100%
2 BHK REHAB53.24110
100%
2 BHK REHAB54.67220
100%
2 BHK REHAB60.43110
100%
2 BHK REHAB60.72110
100%
2 BHK REHAB63.35110
100%
2 BHK REHAB63.58990
100%
2 BHK REHAB64.94110
100%
3 BHK90.1711011
0%
3 BHK REHAB85.49110
100%
3 BHK REHAB85.84330
100%
3 BHK REHAB90.17440
100%
Shop21.13101
0%
Shop26.82101
0%
Shop34.46101
0%
Shop38.19101
0%

Construction Progress

Glendon Chsl, Sheldon Chsl, Orlem Luciana Chsl- W

Excavation50%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing5%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

Glendon Chsl, Sheldon Chsl, Orlem Lucianachsl- Wi

Excavation50%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0%
Overall Percentage of Completion of the work done For the entire Building /Wing5%
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0%
Stilt Floor0%
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0%
X number of Basement(s) and Plinth0%
X number of Podiums0%
X number of Slabs of Super Structure0%

RERA Registered Amenities

Aggregate area of recreational Open Space
Community Buildings
Electrical Meter Room, Sub-Station, Receiving Station
Energy management
Fire Protection And Fire Safety Requirements
Landscaping & Tree Planting
Open Parking
Sewerage (Chamber, Lines, Septic Tank , STP)
Solid Waste Management And Disposal
Storm Water Drains
Street Lighting
Treatment And Disposal Of Sewage And Sullage Water
Water Conservation, Rain water Harvesting
Water Supply
CallWhatsApp
✉️

Get in Touch

Our team will connect with you shortly

+91
🔒 Your details are secure with us
⚡ If need urgent details +91 98200 67525 for further details.
This website is for the use of Actual Home Buyers/Renters and Owners and Property Investors only.
👋 Looking for the right project? Let me help you find it!
🏗️
MPE Project Advisor
● Online now