R
✓ MahaRERA P99000018694RERA: no litigation reportedRustomjee Virar Avenue L1 - L2 And L4 Wing C and D
📍 Avenue L1-L2, Palghar · 401303
234
Units
2022
Possession
2
Buildings
Certificate Signed
Status
Lifecycle requires verification
Ask an advisor to verify the current project and inventory status.
Source stage: New · mapped resale: 0 · mapped rental: 0 · primary status: not confirmed
01
Possession Timeline
Proposed
Jul 2022
Status
New
02
Unit Configurations (per MahaRERA)
ConfigurationCarpetIndicative Price
1 BHK331 ft²On request
2 BHK472–512 ft²On request
Configurations & carpet per MahaRERA filing · indicative price = locality rate × carpet (not the developer's quote).
💬 Verify current inventory with an advisor03
RERA Trust Record
MahaRERA No.
P99000018694
Registered
2021-09-09
Litigation
No reported in source
Escrow Bank
ICICI BANK LIMITED
Architect
M/S. Abhikalpan Architects & Planners
Total FSI
9695
04
Buildings · 2 Wing(s)
Wing C18 floors · — units
Wing D18 floors · — units
05
Land DNA · Genesis
Redevelopment / SRA / MHADA / MMRDA / Freehold — provenance from MPE's verification layer. The genesis no portal shows.
06
Location
📍 Avenue L1-L2
19.471236650249620,72.807146283911150
19.471236650249620,72.807146283911150
▸ Explore map & Street View — for verified buyers
07
Promoter & Professionals
VINCENT PATRICK RODRIGUESDirector
09
Construction Progress
85% avgBasement (if any)100%
Excavation100%
Plinth100%
Slabs of Super Structure100%
X number of Basement(s) and Plinth100%
X number of Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises87%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises87%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks79%
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.79%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises77%
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises77%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.52%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate52%
10
Amenities
DG Back up for Elevators and Common area LightingDesigner Entrance LobbyEarthquake resistant structureElectrical Meter Room, Sub-Station, Receiving StationElevatorsEnergy managementFire Protection And Fire Safety RequirementsOpen ParkingSewerage (Chamber, Lines, Septic Tank , STP)Solar SystemSolid Waste Management And DisposalStaircase and lift lobbiesStorm Water DrainsWater Conservation, Rain water HarvestingWater Supplybox cricket on podium topcommon area fire sprinklerscommon area lightingfutsal court on podium topmultipurpose lawn on podium toporganic waster converter for recycle of wet garbagepodium parkingpodium top landscaping and Trees plantingwalking cum jogging track on podium top
12
Talk to our MahaRERA advisor
Tell our MahaRERA advisor what you need and they'll guide you on this project.
💬 Verify current project inventory08
Property Rates in Avenue L1-L2
Residential · Sale
₹6,000–10,000/sqft
Commercial · Sale
₹6,000–7,500/sqft
2 BHK · Rent
₹10,000–20,000/mo
Full rates
?
Frequently Asked Questions
When is possession of Rustomjee Virar Avenue L1 - L2 And L4 Wing C and D?
As per MahaRERA, proposed possession is Jul 2022.
Is Rustomjee Virar Avenue L1 - L2 And L4 Wing C and D RERA-registered?
Yes — MahaRERA registration P99000018694, registered 2021-09-09. The current MahaRERA source record reports no litigations.
Who is the developer?
Keystone Infrastructure — 5 projects tracked on Mumbai Property Exchange. View their track record ▸
How do I book or get more details?
Tap WhatsApp or Call below to speak with a Mumbai Property Exchange advisor — serving Mumbai since 1995 · RERA-registered since 2017.




